Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
37.5 min
Lead Time (LT)
7.39 d
Value-Added
2.3 h
Efficiency (PCE)
4.12%
BottleneckMissing Utility Estimation Fix
8 < 12/day
Limit: downtime
Quality (RTY)
72.3%
WIP Capital
€204,000
Carbon CO₂
0.6 t CO₂e/year