Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
CapEx Project Activation & Fixed Asset Depreciation
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
10.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.84 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
36.5 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.04%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Asset Class & Useful Life Tag
29 < 45/day
Limit: downtime
Asset Class & Useful Life Tag: capacity 29/day vs demand 45/day. Main limit: downtime. Raw C/T 10.7 min, effective C/T 14.0 min.
Quality (RTY)
72.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€38,390
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Engineering CapEx Lea…
Equipment Commissioning…
Daily POD Sync · LT 1d
PRODUCTION CONTROL / ERP
ERP FI-AA
Exception Rework Loops
CUSTOMER
Plant Controllers
45 files/d
Takt: 10.0 min
EDI / Daily Cash Run
MRP / Daily POD Sync
★ PACEMAKER
IN
Insert a step at the start
+
I
63
1.40 d
Drag to reorder step 1
INTAKE DESK
1. CapEx WBS Spend …
×3
Push Flow
C/T
6.6 min
C/O
2 min
Availability
96%
Quality FPY
89.5%
Batch / EPEI
11 / 1d
OEE
84.4%
i
Insert a step here
+
I
68
1.51 d
Drag to reorder step 2
BILLING/AP
2. Plant Acceptance…
×2
Push Flow
C/T
7.8 min
C/O
2 min
Availability
95%
Quality FPY
93.8%
Batch / EPEI
11 / 1d
OEE
87.5%
i
Insert a step here
+
I
131
2.91 d
QUALITY
Source CR…
Drag to reorder step 3
DISPUTES DESK
3. Asset Class & Us…
×4
BOTTLENECK
C/T
10.7 min
C/O
8 min
Availability
86%
Quality FPY
89.0%
Batch / EPEI
9 / 1d
OEE
69.7%
i
Insert a step here
+
I
41
0.91 d
Drag to reorder step 4
CONTROLLERS
4. Settlement AuC t…
×2
FIFO Lane
C/T
6.4 min
C/O
3 min
Availability
97%
Quality FPY
98.4%
Batch / EPEI
9 / 1d
OEE
92.3%
i
FIFO
Insert a step here
+
I
23
0.51 d
Drag to reorder step 5
TREASURY
5. Monthly Deprecia…
×1
Continuous Flow
C/T
5.0 min
C/O
2 min
Availability
99%
Quality FPY
99.1%
Batch / EPEI
7 / 1d
OEE
95.3%
i
Insert a step at the end
+
I
23
0.51 d
Finished Goods
OUT
1.40 d
VA 6.6 min
1.51 d
VA 7.8 min
2.91 d
VA 10.7 min
0.91 d
VA 6.4 min
0.51 d
VA 5.0 min
0.51 d
Total Lead Time
7.84 d
VA Time
36.5 min
PCE
1.04%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step