Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Statutory 30-Day GDPR Subject Access Request
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
5.3 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.36 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
19.2 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.51%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Redaction of 3rd-Party PII
52 < 85/day
Limit: changeovers
Redaction of 3rd-Party PII: capacity 52/day vs demand 85/day. Main limit: changeovers. Raw C/T 5.7 min, effective C/T 7.6 min.
Quality (RTY)
74.5%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€67,165
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
3.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Consumer Privacy Port…
User IDs Across 14 SaaS…
Continuous External · LT 2d
PRODUCTION CONTROL / ERP
Privacy Management Platform
Email Redline Ping-Pong
CUSTOMER
Data Subjects & DPO O…
85 cases/d
Takt: 5.3 min
EDI / E-Sign Complete
MRP / Continuous External
★ PACEMAKER
IN
Insert a step at the start
+
I
119
1.40 d
Drag to reorder step 1
LEGAL INTAKE
1. Requester ID Ver…
×2
FIFO Lane
C/T
3.3 min
C/O
5 min
Availability
97%
Quality FPY
91.5%
Batch / EPEI
21 / 1d
OEE
84.8%
i
FIFO
Insert a step here
+
I
153
1.80 d
Drag to reorder step 2
PRIVACY/TAX
2. Automated DB PII…
×2
Push Flow
C/T
4.2 min
C/O
8 min
Availability
93%
Quality FPY
94.0%
Batch / EPEI
21 / 1d
OEE
81.1%
i
Insert a step here
+
I
298
3.51 d
FLOW
Pre-Appro…
Drag to reorder step 3
COUNSEL DESK
3. Redaction of 3rd…
×3
BOTTLENECK
C/T
5.7 min
C/O
12 min
Availability
85%
Quality FPY
89.0%
Batch / EPEI
17 / 1d
OEE
65.6%
i
Insert a step here
+
I
77
0.91 d
Drag to reorder step 4
GC / CFO
4. DPO Legal Compli…
×1
FIFO Lane
C/T
3.6 min
C/O
4 min
Availability
96%
Quality FPY
97.8%
Batch / EPEI
9 / 1d
OEE
86.0%
i
FIFO
Insert a step here
+
I
34
0.40 d
Drag to reorder step 5
CLM REPOSITORY
5. Encrypted Archiv…
×1
Continuous Flow
C/T
2.4 min
C/O
2 min
Availability
99%
Quality FPY
99.5%
Batch / EPEI
9 / 1d
OEE
94.4%
i
Insert a step at the end
+
I
26
0.31 d
Finished Goods
OUT
1.40 d
VA 3.3 min
1.80 d
VA 4.2 min
3.51 d
VA 5.7 min
0.91 d
VA 3.6 min
0.40 d
VA 2.4 min
0.31 d
Total Lead Time
8.36 d
VA Time
19.2 min
PCE
0.51%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step