Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Green Energy Solar & Wind Project Finance
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.3 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.25 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
4.4 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
6.36%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Green Taxonomy & Credit Desk
4 < 6/day
Limit: downtime
Green Taxonomy & Credit Desk: capacity 4/day vs demand 6/day. Main limit: downtime. Raw C/T 1.3 h, effective C/T 1.8 h.
Quality (RTY)
66.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€218,400
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
0.7 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Independent Technical…
PPA Offtake & Wind Reso…
Continuous API · LT 2d
PRODUCTION CONTROL / ERP
Project Finance CRM
FIFO Queue with Manual Return Loops
CUSTOMER
Utility IPP Developers
6 files/d
Takt: 1.3 h
EDI / Daily SEPA/SWIFT
MRP / Continuous API
★ PACEMAKER
IN
Insert a step at the start
+
I
11
1.83 d
Drag to reorder step 1
FRONT OFFICE
1. P50/P90 Yield & …
×3
Push Flow
C/T
48.0 min
C/O
5 min
Availability
96%
Quality FPY
86.0%
Batch / EPEI
2 / 1d
OEE
79.8%
i
Insert a step here
+
I
10
1.67 d
Drag to reorder step 2
COMPLIANCE
2. Independent Engi…
×2
Push Flow
C/T
58.5 min
C/O
8 min
Availability
94%
Quality FPY
91.5%
Batch / EPEI
2 / 1d
OEE
81.4%
i
Insert a step here
+
I
19
3.17 d
QUALITY
Straight-…
Drag to reorder step 3
RISK DESK
3. Green Taxonomy &…
×4
BOTTLENECK
C/T
1.3 h
C/O
12 min
Availability
86%
Quality FPY
88.0%
Batch / EPEI
1 / 1d
OEE
73.7%
i
Insert a step here
+
I
6
1.00 d
Drag to reorder step 4
LEGAL OPS
4. Security Trustee…
×2
FIFO Lane
C/T
46.5 min
C/O
5 min
Availability
97%
Quality FPY
96.5%
Batch / EPEI
1 / 1d
OEE
92.6%
i
FIFO
Insert a step here
+
I
3
0.50 d
Drag to reorder step 5
TREASURY
5. Construction Mil…
×1
Continuous Flow
C/T
31.5 min
C/O
2 min
Availability
99%
Quality FPY
99.4%
Batch / EPEI
1 / 1d
OEE
98.0%
i
Insert a step at the end
+
I
3
0.50 d
Finished Goods
OUT
1.83 d
VA 48.0 min
1.67 d
VA 58.5 min
3.17 d
VA 1.3 h
1.00 d
VA 46.5 min
0.50 d
VA 31.5 min
0.50 d
Total Lead Time
9.25 d
VA Time
4.4 h
PCE
6.36%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step