Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Monthly Intercompany Cross-Charge Reconciliation
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
5.3 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.77 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
19.3 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.55%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Unmatched Dispute Escalate
55 < 85/day
Limit: downtime
Unmatched Dispute Escalate: capacity 55/day vs demand 85/day. Main limit: downtime. Raw C/T 5.7 min, effective C/T 7.4 min.
Quality (RTY)
72.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€42,705
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
2.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
18 Global Subsidiaries
Transfer Pricing Servic…
Daily POD Sync · LT 1d
PRODUCTION CONTROL / ERP
Close Management + ERP
Exception Rework Loops
CUSTOMER
Group Consolidation C…
85 invoices/d
Takt: 5.3 min
EDI / Daily Cash Run
MRP / Daily POD Sync
★ PACEMAKER
IN
Insert a step at the start
+
I
119
1.40 d
Drag to reorder step 1
INTAKE DESK
1. IC Automated Led…
×3
Push Flow
C/T
3.5 min
C/O
2 min
Availability
96%
Quality FPY
89.5%
Batch / EPEI
21 / 1d
OEE
84.4%
i
Insert a step here
+
I
128
1.51 d
Drag to reorder step 2
BILLING/AP
2. FX & Cutoff Matc…
×2
Push Flow
C/T
4.1 min
C/O
2 min
Availability
95%
Quality FPY
93.8%
Batch / EPEI
21 / 1d
OEE
87.5%
i
Insert a step here
+
I
247
2.91 d
QUALITY
Source CR…
Drag to reorder step 3
DISPUTES DESK
3. Unmatched Disput…
×4
BOTTLENECK
C/T
5.7 min
C/O
8 min
Availability
86%
Quality FPY
89.0%
Batch / EPEI
17 / 1d
OEE
69.7%
i
Insert a step here
+
I
77
0.91 d
Drag to reorder step 4
CONTROLLERS
4. Transfer Pricing…
×2
FIFO Lane
C/T
3.4 min
C/O
3 min
Availability
97%
Quality FPY
98.4%
Batch / EPEI
17 / 1d
OEE
92.3%
i
FIFO
Insert a step here
+
I
43
0.51 d
Drag to reorder step 5
TREASURY
5. Zero-Balance Clo…
×1
Continuous Flow
C/T
2.7 min
C/O
2 min
Availability
99%
Quality FPY
99.1%
Batch / EPEI
13 / 1d
OEE
95.3%
i
Insert a step at the end
+
I
43
0.51 d
Finished Goods
OUT
1.40 d
VA 3.5 min
1.51 d
VA 4.1 min
2.91 d
VA 5.7 min
0.91 d
VA 3.4 min
0.51 d
VA 2.7 min
0.51 d
Total Lead Time
7.77 d
VA Time
19.3 min
PCE
0.55%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step