Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Commercial Retail Mall Lease Agreement Cycle
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
20.5 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.53 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.2 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.93%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Landlord Counsel Redline Swap
13 < 22/day
Limit: changeovers
Landlord Counsel Redline Swap: capacity 13/day vs demand 22/day. Main limit: changeovers. Raw C/T 22.1 min, effective C/T 29.2 min.
Quality (RTY)
74.5%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€90,160
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
0.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
REIT Landlord Counsel
Space CAD & Letter of I…
Continuous External · LT 2d
PRODUCTION CONTROL / ERP
Lease Admin ERP
Email Redline Ping-Pong
CUSTOMER
Retail Expansion Teams
22 files/d
Takt: 20.5 min
EDI / E-Sign Complete
MRP / Continuous External
★ PACEMAKER
IN
Insert a step at the start
+
I
31
1.41 d
Drag to reorder step 1
LEGAL INTAKE
1. LOI Commercial T…
×2
FIFO Lane
C/T
12.7 min
C/O
5 min
Availability
97%
Quality FPY
91.5%
Batch / EPEI
6 / 1d
OEE
85.1%
i
FIFO
Insert a step here
+
I
40
1.82 d
Drag to reorder step 2
PRIVACY/TAX
2. Draft Lease Co-T…
×2
Push Flow
C/T
16.4 min
C/O
8 min
Availability
93%
Quality FPY
94.0%
Batch / EPEI
6 / 1d
OEE
81.7%
i
Insert a step here
+
I
77
3.50 d
FLOW
Pre-Appro…
Drag to reorder step 3
COUNSEL DESK
3. Landlord Counsel…
×3
BOTTLENECK
C/T
22.1 min
C/O
12 min
Availability
85%
Quality FPY
89.0%
Batch / EPEI
4 / 1d
OEE
64.6%
i
Insert a step here
+
I
20
0.91 d
Drag to reorder step 4
GC / CFO
4. CapEx Committee …
×1
FIFO Lane
C/T
13.9 min
C/O
4 min
Availability
96%
Quality FPY
97.8%
Batch / EPEI
2 / 1d
OEE
84.7%
i
FIFO
Insert a step here
+
I
9
0.41 d
Drag to reorder step 5
CLM REPOSITORY
5. Execution & Stor…
×1
Continuous Flow
C/T
9.2 min
C/O
2 min
Availability
99%
Quality FPY
99.5%
Batch / EPEI
2 / 1d
OEE
93.7%
i
Insert a step at the end
+
I
7
0.32 d
Finished Goods
OUT
1.41 d
VA 12.7 min
1.82 d
VA 16.4 min
3.50 d
VA 22.1 min
0.91 d
VA 13.9 min
0.41 d
VA 9.2 min
0.32 d
Total Lead Time
8.53 d
VA Time
1.2 h
PCE
1.93%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step