Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Private Banking Pledged-Securities Lombard Line
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
12.9 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.73 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
45.4 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.16%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Cross-Border Tax & Compliance
21 < 35/day
Limit: changeovers
Cross-Border Tax & Compliance: capacity 21/day vs demand 35/day. Main limit: changeovers. Raw C/T 13.8 min, effective C/T 18.2 min.
Quality (RTY)
66.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€117,780
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
3.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Custodian Equity Port…
Liquid Bond & Stock Ple…
Continuous API · LT 2d
PRODUCTION CONTROL / ERP
Wealth Core Banking
FIFO Queue with Manual Return Loops
CUSTOMER
HNWI Private Clients
35 files/d
Takt: 12.9 min
EDI / Daily SEPA/SWIFT
MRP / Continuous API
★ PACEMAKER
IN
Insert a step at the start
+
I
63
1.80 d
Drag to reorder step 1
FRONT OFFICE
1. Portfolio LTV Ha…
×3
Push Flow
C/T
8.2 min
C/O
5 min
Availability
96%
Quality FPY
86.0%
Batch / EPEI
9 / 1d
OEE
79.0%
i
Insert a step here
+
I
56
1.60 d
Drag to reorder step 2
COMPLIANCE
2. Margin Concentra…
×2
Push Flow
C/T
10.0 min
C/O
8 min
Availability
94%
Quality FPY
91.5%
Batch / EPEI
9 / 1d
OEE
80.1%
i
Insert a step here
+
I
112
3.20 d
QUALITY
Straight-…
Drag to reorder step 3
RISK DESK
3. Cross-Border Tax…
×4
BOTTLENECK
C/T
13.8 min
C/O
12 min
Availability
86%
Quality FPY
88.0%
Batch / EPEI
7 / 1d
OEE
65.6%
i
Insert a step here
+
I
35
1.00 d
Drag to reorder step 4
LEGAL OPS
4. Pledge Agreement…
×2
FIFO Lane
C/T
8.0 min
C/O
5 min
Availability
97%
Quality FPY
96.5%
Batch / EPEI
4 / 1d
OEE
84.5%
i
FIFO
Insert a step here
+
I
18
0.51 d
Drag to reorder step 5
TREASURY
5. Multi-Currency C…
×1
Continuous Flow
C/T
5.4 min
C/O
2 min
Availability
99%
Quality FPY
99.4%
Batch / EPEI
4 / 1d
OEE
94.6%
i
Insert a step at the end
+
I
18
0.51 d
Finished Goods
OUT
1.80 d
VA 8.2 min
1.60 d
VA 10.0 min
3.20 d
VA 13.8 min
1.00 d
VA 8.0 min
0.51 d
VA 5.4 min
0.51 d
Total Lead Time
8.73 d
VA Time
45.4 min
PCE
1.16%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step