Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
M&A Buy-Side Financial & Legal Due Diligence
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.9 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.16 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
6.8 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
11.18%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Tax & Litigation Red-Flag Probe
3 < 4/day
Limit: downtime
Tax & Litigation Red-Flag Probe: capacity 3/day vs demand 4/day. Main limit: downtime. Raw C/T 2.0 h, effective C/T 2.6 h.
Quality (RTY)
72.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€188,500
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
0.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Target VDR Virtual Da…
Audited Accounts & Cont…
Real-Time Sanctions · LT 1d
PRODUCTION CONTROL / ERP
Deal CRM
False-Positive Manual Alert Queue
CUSTOMER
PE Investment Committ…
4 cases/d
Takt: 1.9 h
EDI / Continuous Portal
MRP / Real-Time Sanctions
★ PACEMAKER
IN
Insert a step at the start
+
I
5
1.25 d
Drag to reorder step 1
ONBOARDING
1. VDR Index & QoE …
×2
FIFO Lane
C/T
1.2 h
C/O
3 min
Availability
97%
Quality FPY
92.5%
Batch / EPEI
1 / 1d
OEE
89.1%
i
FIFO
Insert a step here
+
I
6
1.50 d
Drag to reorder step 2
FINCRIME SCREENING
2. EBITDA Normaliza…
×2
Push Flow
C/T
1.4 h
C/O
4 min
Availability
95%
Quality FPY
90.0%
Batch / EPEI
1 / 1d
OEE
84.7%
i
Insert a step here
+
I
11
2.75 d
AUTOMATION
False-Pos…
Drag to reorder step 3
COMPLIANCE OFFICER
3. Tax & Litigation…
×3
BOTTLENECK
C/T
2.0 h
C/O
8 min
Availability
86%
Quality FPY
89.5%
Batch / EPEI
1 / 1d
OEE
75.6%
i
Insert a step here
+
I
3
0.75 d
Drag to reorder step 4
PRIVATE BANKER
4. Partner IC Synth…
×2
FIFO Lane
C/T
1.3 h
C/O
5 min
Availability
96%
Quality FPY
97.6%
Batch / EPEI
1 / 1d
OEE
92.7%
i
FIFO
Insert a step here
+
I
2
0.50 d
Drag to reorder step 5
OPERATIONS
5. Binding Offer Pr…
×1
Continuous Flow
C/T
54.0 min
C/O
2 min
Availability
99%
Quality FPY
99.4%
Batch / EPEI
1 / 1d
OEE
98.0%
i
Insert a step at the end
+
I
2
0.50 d
Finished Goods
OUT
1.25 d
VA 1.2 h
1.50 d
VA 1.4 h
2.75 d
VA 2.0 h
0.75 d
VA 1.3 h
0.50 d
VA 54.0 min
0.50 d
Total Lead Time
8.16 d
VA Time
6.8 h
PCE
11.18%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step