Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Ocean Marine Cargo Damage & General Average Claim
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
18.8 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.40 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.1 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.82%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Salvage Recovery & Subrogation
15 < 24/day
Limit: downtime
Salvage Recovery & Subrogation: capacity 15/day vs demand 24/day. Main limit: downtime. Raw C/T 20.3 min, effective C/T 26.5 min.
Quality (RTY)
70.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€134,640
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Specialty Marine Surv…
Bill of Lading & Survey…
Daily Adjusters · LT 3d
PRODUCTION CONTROL / ERP
Marine Claims ERP
Manual Triage & Pool Escalation
CUSTOMER
Import Traders & Carr…
24 claims/d
Takt: 18.8 min
EDI / Daily Payout
MRP / Daily Adjusters
★ PACEMAKER
IN
Insert a step at the start
+
I
34
1.42 d
Drag to reorder step 1
CONTACT CENTER
1. Notice of Loss &…
×4
Push Flow
C/T
12.8 min
C/O
3 min
Availability
97%
Quality FPY
88.0%
Batch / EPEI
5 / 1d
OEE
82.6%
i
Insert a step here
+
I
43
1.79 d
Drag to reorder step 2
BACK OFFICE
2. Appoint Port Car…
×3
Push Flow
C/T
14.6 min
C/O
5 min
Availability
94%
Quality FPY
93.5%
Batch / EPEI
6 / 1d
OEE
84.0%
i
Insert a step here
+
I
82
3.42 d
AUTOMATION
Fast-Trac…
Drag to reorder step 3
TECHNICAL CLAIMS
3. Salvage Recovery…
×5
BOTTLENECK
C/T
20.3 min
C/O
10 min
Availability
86%
Quality FPY
89.0%
Batch / EPEI
6 / 2d
OEE
69.7%
i
Insert a step here
+
I
19
0.79 d
Drag to reorder step 4
CLAIMS LEAD
4. Underwriter Dedu…
×2
FIFO Lane
C/T
12.8 min
C/O
4 min
Availability
96%
Quality FPY
97.4%
Batch / EPEI
2 / 1d
OEE
83.5%
i
FIFO
Insert a step here
+
I
10
0.42 d
Drag to reorder step 5
FINANCE OPS
5. USD/EUR Marine S…
×1
Continuous Flow
C/T
8.4 min
C/O
2 min
Availability
99%
Quality FPY
99.1%
Batch / EPEI
2 / 1d
OEE
92.9%
i
Insert a step at the end
+
I
10
0.42 d
Finished Goods
OUT
1.42 d
VA 12.8 min
1.79 d
VA 14.6 min
3.42 d
VA 20.3 min
0.79 d
VA 12.8 min
0.42 d
VA 8.4 min
0.42 d
Total Lead Time
8.40 d
VA Time
1.1 h
PCE
1.82%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step