Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
2.4 min
Lead Time (LT)
7.02 d
Value-Added
8.6 min
Efficiency (PCE)
0.27%
BottleneckHigh-Risk Rolling Reserve Eval
125 < 190/day
Limit: downtime
Quality (RTY)
72.3%
WIP Capital
€55,860
Carbon CO₂
9.2 t CO₂e/year