Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Mobile Field Microfinance Entrepreneur Loan
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
75 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.61 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
4.4 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.11%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Branch Manager Exception Check
221 < 360/day
Limit: changeovers
Branch Manager Exception Check: capacity 221/day vs demand 360/day. Main limit: changeovers. Raw C/T 80 s, effective C/T 106 s.
Quality (RTY)
66.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€55,728
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
39.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Field Credit Officers
Tablet Photo & Cash Led…
Continuous API · LT 2d
PRODUCTION CONTROL / ERP
Digital Core Banking
FIFO Queue with Manual Return Loops
CUSTOMER
Small Retail Merchants
360 files/d
Takt: 75 s
EDI / Daily SEPA/SWIFT
MRP / Continuous API
★ PACEMAKER
IN
Insert a step at the start
+
I
648
1.80 d
Drag to reorder step 1
FRONT OFFICE
1. Officer Mobile K…
×3
Push Flow
C/T
48 s
C/O
5 min
Availability
96%
Quality FPY
86.0%
Batch / EPEI
90 / 1d
OEE
78.9%
i
Insert a step here
+
I
576
1.60 d
Drag to reorder step 2
COMPLIANCE
2. Cashflow Proxy S…
×2
Push Flow
C/T
59 s
C/O
8 min
Availability
94%
Quality FPY
91.5%
Batch / EPEI
90 / 1d
OEE
79.9%
i
Insert a step here
+
I
1,152
3.20 d
QUALITY
Straight-…
Drag to reorder step 3
RISK DESK
3. Branch Manager E…
×4
BOTTLENECK
C/T
80 s
C/O
12 min
Availability
86%
Quality FPY
88.0%
Batch / EPEI
72 / 1d
OEE
65.6%
i
Insert a step here
+
I
360
1.00 d
Drag to reorder step 4
LEGAL OPS
4. Biometric Thumb …
×2
FIFO Lane
C/T
47 s
C/O
5 min
Availability
97%
Quality FPY
96.5%
Batch / EPEI
36 / 1d
OEE
83.2%
i
FIFO
Insert a step here
+
I
180
0.50 d
Drag to reorder step 5
TREASURY
5. Mobile Wallet In…
×1
Continuous Flow
C/T
32 s
C/O
2 min
Availability
99%
Quality FPY
99.4%
Batch / EPEI
36 / 1d
OEE
94.0%
i
Insert a step at the end
+
I
180
0.50 d
Finished Goods
OUT
1.80 d
VA 48 s
1.60 d
VA 59 s
3.20 d
VA 80 s
1.00 d
VA 47 s
0.50 d
VA 32 s
0.50 d
Total Lead Time
8.61 d
VA Time
4.4 min
PCE
0.11%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step