Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Daily T+0 Mutual Fund & ETF NAV Valuation Close
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
5.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.02 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
18.3 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.29%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
NAV Break Tolerance Exception
124 < 180/day
Limit: downtime
NAV Break Tolerance Exception: capacity 124/day vs demand 180/day. Main limit: downtime. Raw C/T 5.4 min, effective C/T 7.0 min.
Quality (RTY)
72.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€119,700
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
8.7 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Market Data Feeds
Equities, Bonds & Deriv…
Real-Time Sanctions · LT 1d
PRODUCTION CONTROL / ERP
Fund Accounting System
False-Positive Manual Alert Queue
CUSTOMER
Asset Managers & Cust…
180 batches/d
Takt: 5.0 min
EDI / Continuous Portal
MRP / Real-Time Sanctions
★ PACEMAKER
IN
Insert a step at the start
+
I
216
1.20 d
Drag to reorder step 1
ONBOARDING
1. Market Close Pri…
×2
FIFO Lane
C/T
3.2 min
C/O
3 min
Availability
97%
Quality FPY
92.5%
Batch / EPEI
36 / 1d
OEE
88.2%
i
FIFO
Insert a step here
+
I
252
1.40 d
Drag to reorder step 2
FINCRIME SCREENING
2. Corporate Action…
×2
Push Flow
C/T
3.8 min
C/O
4 min
Availability
95%
Quality FPY
90.0%
Batch / EPEI
36 / 1d
OEE
83.6%
i
Insert a step here
+
I
504
2.80 d
AUTOMATION
False-Pos…
Drag to reorder step 3
COMPLIANCE OFFICER
3. NAV Break Tolera…
×3
BOTTLENECK
C/T
5.4 min
C/O
8 min
Availability
86%
Quality FPY
89.5%
Batch / EPEI
36 / 1d
OEE
73.5%
i
Insert a step here
+
I
144
0.80 d
Drag to reorder step 4
PRIVATE BANKER
4. Trustee Oversigh…
×2
FIFO Lane
C/T
3.5 min
C/O
5 min
Availability
96%
Quality FPY
97.6%
Batch / EPEI
27 / 1d
OEE
90.2%
i
FIFO
Insert a step here
+
I
72
0.40 d
Drag to reorder step 5
OPERATIONS
5. Exchange NAV Pub…
×1
Continuous Flow
C/T
2.4 min
C/O
2 min
Availability
99%
Quality FPY
99.4%
Batch / EPEI
18 / 1d
OEE
96.2%
i
Insert a step at the end
+
I
72
0.40 d
Finished Goods
OUT
1.20 d
VA 3.2 min
1.40 d
VA 3.8 min
2.80 d
VA 5.4 min
0.80 d
VA 3.5 min
0.40 d
VA 2.4 min
0.40 d
Total Lead Time
7.02 d
VA Time
18.3 min
PCE
0.29%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step