Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Accounts Payable Procure-to-Pay (P2P) 3-Way Match
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
83 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.71 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
5.1 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.07%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Price/Qty Block Variance Fix
444 < 650/day
Limit: downtime
Price/Qty Block Variance Fix: capacity 444/day vs demand 650/day. Main limit: downtime. Raw C/T 89 s, effective C/T 116 s.
Quality (RTY)
72.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€60,060
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
17.5 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
2,400 Enterprise Vend…
Peppol XML & PDF Invoic…
Daily POD Sync · LT 1d
PRODUCTION CONTROL / ERP
Procurement Suite + FI/AP
Exception Rework Loops
CUSTOMER
Internal Plant Budget…
650 invoices/d
Takt: 83 s
EDI / Daily Cash Run
MRP / Daily POD Sync
★ PACEMAKER
IN
Insert a step at the start
+
I
910
1.40 d
Drag to reorder step 1
INTAKE DESK
1. E-Invoicing Pepp…
×3
Push Flow
C/T
55 s
C/O
2 min
Availability
96%
Quality FPY
89.5%
Batch / EPEI
163 / 1d
OEE
85.2%
i
Insert a step here
+
I
975
1.50 d
Drag to reorder step 2
BILLING/AP
2. PO vs Goods Rece…
×2
Push Flow
C/T
65 s
C/O
2 min
Availability
95%
Quality FPY
93.8%
Batch / EPEI
163 / 1d
OEE
88.3%
i
Insert a step here
+
I
1,885
2.90 d
QUALITY
Source CR…
Drag to reorder step 3
DISPUTES DESK
3. Price/Qty Block …
×4
BOTTLENECK
C/T
89 s
C/O
8 min
Availability
86%
Quality FPY
89.0%
Batch / EPEI
130 / 1d
OEE
73.1%
i
Insert a step here
+
I
585
0.90 d
Drag to reorder step 4
CONTROLLERS
4. Dual Approval Si…
×2
FIFO Lane
C/T
53 s
C/O
3 min
Availability
97%
Quality FPY
98.4%
Batch / EPEI
130 / 1d
OEE
93.9%
i
FIFO
Insert a step here
+
I
325
0.50 d
Drag to reorder step 5
TREASURY
5. Bi-Weekly SEPA V…
×1
Continuous Flow
C/T
42 s
C/O
2 min
Availability
99%
Quality FPY
99.1%
Batch / EPEI
98 / 1d
OEE
96.7%
i
Insert a step at the end
+
I
325
0.50 d
Finished Goods
OUT
1.40 d
VA 55 s
1.50 d
VA 65 s
2.90 d
VA 89 s
0.90 d
VA 53 s
0.50 d
VA 42 s
0.50 d
Total Lead Time
7.71 d
VA Time
5.1 min
PCE
0.07%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step