Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Quarterly Reinsurance Treaty Bordereaux & Settlement
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
16.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.27 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
59.0 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.58%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Loss Corridor & Quota Calc
18 < 28/day
Limit: downtime
Loss Corridor & Quota Calc: capacity 18/day vs demand 28/day. Main limit: downtime. Raw C/T 17.4 min, effective C/T 22.7 min.
Quality (RTY)
70.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€216,600
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Primary Insurance Ced…
Premium & Claim CSV Bor…
Daily Adjusters · LT 3d
PRODUCTION CONTROL / ERP
Reinsurance Core
Manual Triage & Pool Escalation
CUSTOMER
Global Reinsurers
28 batches/d
Takt: 16.1 min
EDI / Daily Payout
MRP / Daily Adjusters
★ PACEMAKER
IN
Insert a step at the start
+
I
39
1.39 d
Drag to reorder step 1
CONTACT CENTER
1. Standard ACORD B…
×4
Push Flow
C/T
10.9 min
C/O
3 min
Availability
97%
Quality FPY
88.0%
Batch / EPEI
6 / 1d
OEE
82.7%
i
Insert a step here
+
I
50
1.79 d
Drag to reorder step 2
BACK OFFICE
2. Data Quality Sch…
×3
Push Flow
C/T
12.5 min
C/O
5 min
Availability
94%
Quality FPY
93.5%
Batch / EPEI
7 / 1d
OEE
84.0%
i
Insert a step here
+
I
95
3.39 d
AUTOMATION
Fast-Trac…
Drag to reorder step 3
TECHNICAL CLAIMS
3. Loss Corridor & …
×5
BOTTLENECK
C/T
17.4 min
C/O
10 min
Availability
86%
Quality FPY
89.0%
Batch / EPEI
7 / 2d
OEE
69.7%
i
Insert a step here
+
I
22
0.79 d
Drag to reorder step 4
CLAIMS LEAD
4. Actuarial Reserv…
×2
FIFO Lane
C/T
10.9 min
C/O
4 min
Availability
96%
Quality FPY
97.4%
Batch / EPEI
3 / 1d
OEE
85.7%
i
FIFO
Insert a step here
+
I
11
0.39 d
Drag to reorder step 5
FINANCE OPS
5. Quarterly Net Ba…
×1
Continuous Flow
C/T
7.2 min
C/O
2 min
Availability
99%
Quality FPY
99.1%
Batch / EPEI
3 / 1d
OEE
94.0%
i
Insert a step at the end
+
I
11
0.39 d
Finished Goods
OUT
1.39 d
VA 10.9 min
1.79 d
VA 12.5 min
3.39 d
VA 17.4 min
0.79 d
VA 10.9 min
0.39 d
VA 7.2 min
0.39 d
Total Lead Time
8.27 d
VA Time
59.0 min
PCE
1.58%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step