Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
87 s
Lead Time (LT)
7.01 d
Value-Added
5.3 min
Efficiency (PCE)
0.08%
BottleneckManual Fraud Flag Escalation
427 < 620/day
Limit: downtime
Quality (RTY)
72.3%
WIP Capital
€78,120
Carbon CO₂
30.0 t CO₂e/year