Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Enterprise B2B SaaS Master Services Agreement
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
9.4 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.35 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
34.1 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.91%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Counsel Liability Redline Loop
29 < 48/day
Limit: changeovers
Counsel Liability Redline Loop: capacity 29/day vs demand 48/day. Main limit: changeovers. Raw C/T 10.1 min, effective C/T 13.4 min.
Quality (RTY)
74.5%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€77,415
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Enterprise Procuremen…
MSA Draft, DPA & SLA An…
Continuous External · LT 2d
PRODUCTION CONTROL / ERP
CLM Platform
Email Redline Ping-Pong
CUSTOMER
Enterprise Account Ex…
48 files/d
Takt: 9.4 min
EDI / E-Sign Complete
MRP / Continuous External
★ PACEMAKER
IN
Insert a step at the start
+
I
67
1.40 d
Drag to reorder step 1
LEGAL INTAKE
1. CRM Quote-to-Con…
×2
FIFO Lane
C/T
5.8 min
C/O
5 min
Availability
97%
Quality FPY
91.5%
Batch / EPEI
12 / 1d
OEE
84.8%
i
FIFO
Insert a step here
+
I
86
1.79 d
Drag to reorder step 2
PRIVACY/TAX
2. Infosec & DPA Pr…
×2
Push Flow
C/T
7.5 min
C/O
8 min
Availability
93%
Quality FPY
94.0%
Batch / EPEI
12 / 1d
OEE
81.2%
i
Insert a step here
+
I
168
3.50 d
FLOW
Pre-Appro…
Drag to reorder step 3
COUNSEL DESK
3. Counsel Liabilit…
×3
BOTTLENECK
C/T
10.1 min
C/O
12 min
Availability
85%
Quality FPY
89.0%
Batch / EPEI
10 / 1d
OEE
66.0%
i
Insert a step here
+
I
43
0.90 d
Drag to reorder step 4
GC / CFO
4. VP Finance Non-S…
×1
FIFO Lane
C/T
6.4 min
C/O
4 min
Availability
96%
Quality FPY
97.8%
Batch / EPEI
5 / 1d
OEE
85.9%
i
FIFO
Insert a step here
+
I
19
0.40 d
Drag to reorder step 5
CLM REPOSITORY
5. E-Sign Countersi…
×1
Continuous Flow
C/T
4.2 min
C/O
2 min
Availability
99%
Quality FPY
99.5%
Batch / EPEI
5 / 1d
OEE
94.3%
i
Insert a step at the end
+
I
14
0.29 d
Finished Goods
OUT
1.40 d
VA 5.8 min
1.79 d
VA 7.5 min
3.50 d
VA 10.1 min
0.90 d
VA 6.4 min
0.40 d
VA 4.2 min
0.29 d
Total Lead Time
8.35 d
VA Time
34.1 min
PCE
0.91%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step