Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Enterprise SaaS Sales Quota & Commission Payout
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
4.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.73 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
14.9 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.43%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Quota Tier Accelerator Review
72 < 110/day
Limit: downtime
Quota Tier Accelerator Review: capacity 72/day vs demand 110/day. Main limit: downtime. Raw C/T 4.4 min, effective C/T 5.7 min.
Quality (RTY)
72.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€57,596
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
3.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
CRM Closed-Won Deals
ARR Bookings & Split Ru…
Daily POD Sync · LT 1d
PRODUCTION CONTROL / ERP
Commission Platform
Exception Rework Loops
CUSTOMER
Account Executives & …
110 files/d
Takt: 4.1 min
EDI / Daily Cash Run
MRP / Daily POD Sync
★ PACEMAKER
IN
Insert a step at the start
+
I
154
1.40 d
Drag to reorder step 1
INTAKE DESK
1. CRM Booking Spli…
×3
Push Flow
C/T
2.7 min
C/O
2 min
Availability
96%
Quality FPY
89.5%
Batch / EPEI
28 / 1d
OEE
84.4%
i
Insert a step here
+
I
165
1.50 d
Drag to reorder step 2
BILLING/AP
2. Clawback & Multi…
×2
Push Flow
C/T
3.2 min
C/O
2 min
Availability
95%
Quality FPY
93.8%
Batch / EPEI
28 / 1d
OEE
87.6%
i
Insert a step here
+
I
319
2.90 d
QUALITY
Source CR…
Drag to reorder step 3
DISPUTES DESK
3. Quota Tier Accel…
×4
BOTTLENECK
C/T
4.4 min
C/O
8 min
Availability
86%
Quality FPY
89.0%
Batch / EPEI
22 / 1d
OEE
69.7%
i
Insert a step here
+
I
99
0.90 d
Drag to reorder step 4
CONTROLLERS
4. Rep Dispute Wind…
×2
FIFO Lane
C/T
2.6 min
C/O
3 min
Availability
97%
Quality FPY
98.4%
Batch / EPEI
22 / 1d
OEE
92.3%
i
FIFO
Insert a step here
+
I
55
0.50 d
Drag to reorder step 5
TREASURY
5. Payroll Commissi…
×1
Continuous Flow
C/T
2.1 min
C/O
2 min
Availability
99%
Quality FPY
99.1%
Batch / EPEI
17 / 1d
OEE
95.3%
i
Insert a step at the end
+
I
55
0.50 d
Finished Goods
OUT
1.40 d
VA 2.7 min
1.50 d
VA 3.2 min
2.90 d
VA 4.4 min
0.90 d
VA 2.6 min
0.50 d
VA 2.1 min
0.50 d
Total Lead Time
7.73 d
VA Time
14.9 min
PCE
0.43%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step