Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Working Capital SME Revolving Credit Facility
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
9.4 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.68 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
33.1 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.85%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Credit Committee Exception
30 < 48/day
Limit: changeovers
Credit Committee Exception: capacity 30/day vs demand 48/day. Main limit: changeovers. Raw C/T 10.0 min, effective C/T 13.3 min.
Quality (RTY)
66.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€68,145
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
5.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Tax Registry & OpenBa…
OpenBanking Cashflow Da…
Continuous API · LT 2d
PRODUCTION CONTROL / ERP
Lending Platform / Core Bank
FIFO Queue with Manual Return Loops
CUSTOMER
Mid-Market CFOs
48 files/d
Takt: 9.4 min
EDI / Daily SEPA/SWIFT
MRP / Continuous API
★ PACEMAKER
IN
Insert a step at the start
+
I
86
1.79 d
Drag to reorder step 1
FRONT OFFICE
1. OpenBanking API …
×3
Push Flow
C/T
6.0 min
C/O
5 min
Availability
96%
Quality FPY
86.0%
Batch / EPEI
12 / 1d
OEE
78.9%
i
Insert a step here
+
I
77
1.60 d
Drag to reorder step 2
COMPLIANCE
2. Automated Debt-S…
×2
Push Flow
C/T
7.3 min
C/O
8 min
Availability
94%
Quality FPY
91.5%
Batch / EPEI
12 / 1d
OEE
79.9%
i
Insert a step here
+
I
154
3.21 d
QUALITY
Straight-…
Drag to reorder step 3
RISK DESK
3. Credit Committee…
×4
BOTTLENECK
C/T
10.0 min
C/O
12 min
Availability
86%
Quality FPY
88.0%
Batch / EPEI
10 / 1d
OEE
66.0%
i
Insert a step here
+
I
48
1.00 d
Drag to reorder step 4
LEGAL OPS
4. Digital Guarante…
×2
FIFO Lane
C/T
5.8 min
C/O
5 min
Availability
97%
Quality FPY
96.5%
Batch / EPEI
5 / 1d
OEE
83.6%
i
FIFO
Insert a step here
+
I
24
0.50 d
Drag to reorder step 5
TREASURY
5. Facility Limit L…
×1
Continuous Flow
C/T
3.9 min
C/O
2 min
Availability
99%
Quality FPY
99.4%
Batch / EPEI
5 / 1d
OEE
94.2%
i
Insert a step at the end
+
I
24
0.50 d
Finished Goods
OUT
1.79 d
VA 6.0 min
1.60 d
VA 7.3 min
3.21 d
VA 10.0 min
1.00 d
VA 5.8 min
0.50 d
VA 3.9 min
0.50 d
Total Lead Time
8.68 d
VA Time
33.1 min
PCE
0.85%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step