Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Construction Performance & Bid Surety Bond Desk
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
10.7 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.33 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
39.3 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.05%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Attorney-in-Fact Risk Sign
27 < 42/day
Limit: downtime
Attorney-in-Fact Risk Sign: capacity 27/day vs demand 42/day. Main limit: downtime. Raw C/T 11.6 min, effective C/T 15.1 min.
Quality (RTY)
70.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€67,470
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
2.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Audited Contractor Fi…
WIP Schedule & Bid Tend…
Daily Adjusters · LT 3d
PRODUCTION CONTROL / ERP
Surety Bond ERP
Manual Triage & Pool Escalation
CUSTOMER
General Civil Contrac…
42 files/d
Takt: 10.7 min
EDI / Daily Payout
MRP / Daily Adjusters
★ PACEMAKER
IN
Insert a step at the start
+
I
59
1.40 d
Drag to reorder step 1
CONTACT CENTER
1. Project Specs & …
×4
Push Flow
C/T
7.3 min
C/O
3 min
Availability
97%
Quality FPY
88.0%
Batch / EPEI
8 / 1d
OEE
82.4%
i
Insert a step here
+
I
76
1.81 d
Drag to reorder step 2
BACK OFFICE
2. Liquidity & Back…
×3
Push Flow
C/T
8.4 min
C/O
5 min
Availability
94%
Quality FPY
93.5%
Batch / EPEI
11 / 1d
OEE
84.2%
i
Insert a step here
+
I
143
3.40 d
AUTOMATION
Fast-Trac…
Drag to reorder step 3
TECHNICAL CLAIMS
3. Attorney-in-Fact…
×5
BOTTLENECK
C/T
11.6 min
C/O
10 min
Availability
86%
Quality FPY
89.0%
Batch / EPEI
11 / 2d
OEE
70.0%
i
Insert a step here
+
I
34
0.81 d
Drag to reorder step 4
CLAIMS LEAD
4. Digital Seal Bon…
×2
FIFO Lane
C/T
7.3 min
C/O
4 min
Availability
96%
Quality FPY
97.4%
Batch / EPEI
4 / 1d
OEE
84.8%
i
FIFO
Insert a step here
+
I
17
0.40 d
Drag to reorder step 5
FINANCE OPS
5. Project Obligee …
×1
Continuous Flow
C/T
4.8 min
C/O
2 min
Availability
99%
Quality FPY
99.1%
Batch / EPEI
4 / 1d
OEE
93.5%
i
Insert a step at the end
+
I
17
0.40 d
Finished Goods
OUT
1.40 d
VA 7.3 min
1.81 d
VA 8.4 min
3.40 d
VA 11.6 min
0.81 d
VA 7.3 min
0.40 d
VA 4.8 min
0.40 d
Total Lead Time
8.33 d
VA Time
39.3 min
PCE
1.05%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step