Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
3.1 min
Lead Time (LT)
7.01 d
Value-Added
11.3 min
Efficiency (PCE)
0.18%
BottleneckDual-Control Ops Repair
200 < 290/day
Limit: downtime
Quality (RTY)
72.3%
WIP Capital
€44,660
Carbon CO₂
14.0 t CO₂e/year