Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
International Import Letter of Credit (LC) Issue
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
6.9 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.67 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
24.4 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.63%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Discrepancy Document Examination
40 < 65/day
Limit: changeovers
Discrepancy Document Examination: capacity 40/day vs demand 65/day. Main limit: changeovers. Raw C/T 7.4 min, effective C/T 9.8 min.
Quality (RTY)
66.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€117,600
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
7.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Interbank Messaging N…
Proforma Invoice & Bill…
Continuous API · LT 2d
PRODUCTION CONTROL / ERP
TradeFinance ERP
FIFO Queue with Manual Return Loops
CUSTOMER
Import/Export Corpora…
65 files/d
Takt: 6.9 min
EDI / Daily SEPA/SWIFT
MRP / Continuous API
★ PACEMAKER
IN
Insert a step at the start
+
I
117
1.80 d
Drag to reorder step 1
FRONT OFFICE
1. SWIFT MT700 Appl…
×3
Push Flow
C/T
4.4 min
C/O
5 min
Availability
96%
Quality FPY
86.0%
Batch / EPEI
16 / 1d
OEE
78.8%
i
Insert a step here
+
I
104
1.60 d
Drag to reorder step 2
COMPLIANCE
2. Sanctions & Dual…
×2
Push Flow
C/T
5.4 min
C/O
8 min
Availability
94%
Quality FPY
91.5%
Batch / EPEI
16 / 1d
OEE
79.8%
i
Insert a step here
+
I
208
3.20 d
QUALITY
Straight-…
Drag to reorder step 3
RISK DESK
3. Discrepancy Docu…
×4
BOTTLENECK
C/T
7.4 min
C/O
12 min
Availability
86%
Quality FPY
88.0%
Batch / EPEI
13 / 1d
OEE
65.6%
i
Insert a step here
+
I
65
1.00 d
Drag to reorder step 4
LEGAL OPS
4. Correspondent Ba…
×2
FIFO Lane
C/T
4.3 min
C/O
5 min
Availability
97%
Quality FPY
96.5%
Batch / EPEI
7 / 1d
OEE
83.9%
i
FIFO
Insert a step here
+
I
33
0.51 d
Drag to reorder step 5
TREASURY
5. Trade Settlement…
×1
Continuous Flow
C/T
2.9 min
C/O
2 min
Availability
99%
Quality FPY
99.4%
Batch / EPEI
7 / 1d
OEE
94.3%
i
Insert a step at the end
+
I
33
0.51 d
Finished Goods
OUT
1.80 d
VA 4.4 min
1.60 d
VA 5.4 min
3.20 d
VA 7.4 min
1.00 d
VA 4.3 min
0.51 d
VA 2.9 min
0.51 d
Total Lead Time
8.67 d
VA Time
24.4 min
PCE
0.63%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step