Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Daily Corporate Cash Pooling & FX Hedging Desk
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
7.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.78 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
25.7 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.73%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
FX Exposure Netting & Trade
42 < 64/day
Limit: downtime
FX Exposure Netting & Trade: capacity 42/day vs demand 64/day. Main limit: downtime. Raw C/T 7.5 min, effective C/T 9.8 min.
Quality (RTY)
72.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€88,920
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1.7 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
35 Global Bank Accoun…
MT940 / camt.053 Statem…
Daily POD Sync · LT 1d
PRODUCTION CONTROL / ERP
Treasury TMS
Exception Rework Loops
CUSTOMER
Group CFO Treasury
64 batches/d
Takt: 7.0 min
EDI / Daily Cash Run
MRP / Daily POD Sync
★ PACEMAKER
IN
Insert a step at the start
+
I
90
1.41 d
Drag to reorder step 1
INTAKE DESK
1. Automated Bank B…
×3
Push Flow
C/T
4.6 min
C/O
2 min
Availability
96%
Quality FPY
89.5%
Batch / EPEI
16 / 1d
OEE
84.4%
i
Insert a step here
+
I
96
1.50 d
Drag to reorder step 2
BILLING/AP
2. 13-Week Cash For…
×2
Push Flow
C/T
5.5 min
C/O
2 min
Availability
95%
Quality FPY
93.8%
Batch / EPEI
16 / 1d
OEE
87.5%
i
Insert a step here
+
I
186
2.91 d
QUALITY
Source CR…
Drag to reorder step 3
DISPUTES DESK
3. FX Exposure Nett…
×4
BOTTLENECK
C/T
7.5 min
C/O
8 min
Availability
86%
Quality FPY
89.0%
Batch / EPEI
13 / 1d
OEE
69.8%
i
Insert a step here
+
I
58
0.91 d
Drag to reorder step 4
CONTROLLERS
4. EMIR Trade Confi…
×2
FIFO Lane
C/T
4.5 min
C/O
3 min
Availability
97%
Quality FPY
98.4%
Batch / EPEI
13 / 1d
OEE
92.3%
i
FIFO
Insert a step here
+
I
32
0.50 d
Drag to reorder step 5
TREASURY
5. Zero-Idle Overni…
×1
Continuous Flow
C/T
3.5 min
C/O
2 min
Availability
99%
Quality FPY
99.1%
Batch / EPEI
10 / 1d
OEE
95.3%
i
Insert a step at the end
+
I
32
0.50 d
Finished Goods
OUT
1.41 d
VA 4.6 min
1.50 d
VA 5.5 min
2.91 d
VA 7.5 min
0.91 d
VA 4.5 min
0.50 d
VA 3.5 min
0.50 d
Total Lead Time
7.78 d
VA Time
25.7 min
PCE
0.73%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step