Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Automated Multi-Jurisdiction EU VAT & SAF-T Return
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
18.8 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.90 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.1 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.93%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Cross-Border Intrastat Recon
16 < 24/day
Limit: downtime
Cross-Border Intrastat Recon: capacity 16/day vs demand 24/day. Main limit: downtime. Raw C/T 20.1 min, effective C/T 26.2 min.
Quality (RTY)
72.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€78,120
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
0.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
ERP Sales & Purchase …
Invoice Tax Codes & Cus…
Daily POD Sync · LT 1d
PRODUCTION CONTROL / ERP
Tax Engine / ERP
Exception Rework Loops
CUSTOMER
Tax Authorities Porta…
24 files/d
Takt: 18.8 min
EDI / Daily Cash Run
MRP / Daily POD Sync
★ PACEMAKER
IN
Insert a step at the start
+
I
34
1.42 d
Drag to reorder step 1
INTAKE DESK
1. Ledger Tax Data …
×3
Push Flow
C/T
12.4 min
C/O
2 min
Availability
96%
Quality FPY
89.5%
Batch / EPEI
6 / 1d
OEE
84.4%
i
Insert a step here
+
I
36
1.50 d
Drag to reorder step 2
BILLING/AP
2. Missing Tax-ID A…
×2
Push Flow
C/T
14.6 min
C/O
2 min
Availability
95%
Quality FPY
93.8%
Batch / EPEI
6 / 1d
OEE
87.5%
i
Insert a step here
+
I
70
2.92 d
QUALITY
Source CR…
Drag to reorder step 3
DISPUTES DESK
3. Cross-Border Int…
×4
BOTTLENECK
C/T
20.1 min
C/O
8 min
Availability
86%
Quality FPY
89.0%
Batch / EPEI
5 / 1d
OEE
70.0%
i
Insert a step here
+
I
22
0.92 d
Drag to reorder step 4
CONTROLLERS
4. Tax Director Sta…
×2
FIFO Lane
C/T
12.0 min
C/O
3 min
Availability
97%
Quality FPY
98.4%
Batch / EPEI
5 / 1d
OEE
92.4%
i
FIFO
Insert a step here
+
I
12
0.50 d
Drag to reorder step 5
TREASURY
5. XML Direct E-Fil…
×1
Continuous Flow
C/T
9.4 min
C/O
2 min
Availability
99%
Quality FPY
99.1%
Batch / EPEI
4 / 1d
OEE
95.5%
i
Insert a step at the end
+
I
12
0.50 d
Finished Goods
OUT
1.42 d
VA 12.4 min
1.50 d
VA 14.6 min
2.92 d
VA 20.1 min
0.92 d
VA 12.0 min
0.50 d
VA 9.4 min
0.50 d
Total Lead Time
7.90 d
VA Time
1.1 h
PCE
1.93%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step