Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Global Supplier Master Data & Sanctions Onboarding
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
10.7 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.80 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
39.1 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.11%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Sanctions, Credit & ESG Audit
27 < 42/day
Limit: downtime
Sanctions, Credit & ESG Audit: capacity 27/day vs demand 42/day. Main limit: downtime. Raw C/T 11.5 min, effective C/T 15.0 min.
Quality (RTY)
72.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€30,780
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1.1 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
New Procurement Suppl…
Tax ID, IBAN & ESG Certs
Daily POD Sync · LT 1d
PRODUCTION CONTROL / ERP
Supplier Lifecycle Portal
Exception Rework Loops
CUSTOMER
Purchasing & AP Teams
42 files/d
Takt: 10.7 min
EDI / Daily Cash Run
MRP / Daily POD Sync
★ PACEMAKER
IN
Insert a step at the start
+
I
59
1.40 d
Drag to reorder step 1
INTAKE DESK
1. Supplier Portal …
×3
Push Flow
C/T
7.1 min
C/O
2 min
Availability
96%
Quality FPY
89.5%
Batch / EPEI
11 / 1d
OEE
84.5%
i
Insert a step here
+
I
63
1.50 d
Drag to reorder step 2
BILLING/AP
2. IBAN Bank Accoun…
×2
Push Flow
C/T
8.4 min
C/O
2 min
Availability
95%
Quality FPY
93.8%
Batch / EPEI
11 / 1d
OEE
87.6%
i
Insert a step here
+
I
122
2.90 d
QUALITY
Source CR…
Drag to reorder step 3
DISPUTES DESK
3. Sanctions, Credi…
×4
BOTTLENECK
C/T
11.5 min
C/O
8 min
Availability
86%
Quality FPY
89.0%
Batch / EPEI
8 / 1d
OEE
69.4%
i
Insert a step here
+
I
38
0.90 d
Drag to reorder step 4
CONTROLLERS
4. Tax Withholding …
×2
FIFO Lane
C/T
6.9 min
C/O
3 min
Availability
97%
Quality FPY
98.4%
Batch / EPEI
8 / 1d
OEE
92.1%
i
FIFO
Insert a step here
+
I
21
0.50 d
Drag to reorder step 5
TREASURY
5. ERP Vendor ID Li…
×1
Continuous Flow
C/T
5.4 min
C/O
2 min
Availability
99%
Quality FPY
99.1%
Batch / EPEI
6 / 1d
OEE
95.1%
i
Insert a step at the end
+
I
21
0.50 d
Finished Goods
OUT
1.40 d
VA 7.1 min
1.50 d
VA 8.4 min
2.90 d
VA 11.5 min
0.90 d
VA 6.9 min
0.50 d
VA 5.4 min
0.50 d
Total Lead Time
7.80 d
VA Time
39.1 min
PCE
1.11%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step