Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Private Client Tax-Loss Harvest Portfolio Rebalance
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
3.2 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.03 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
11.7 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.37%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Suitability Compliance Hold
92 < 140/day
Limit: downtime
Suitability Compliance Hold: capacity 92/day vs demand 140/day. Main limit: downtime. Raw C/T 3.4 min, effective C/T 4.5 min.
Quality (RTY)
72.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€76,440
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
6.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Custodian Position Fe…
Multi-Asset ETF & Bond …
Real-Time Sanctions · LT 1d
PRODUCTION CONTROL / ERP
Wealth Core
False-Positive Manual Alert Queue
CUSTOMER
Affluent Advisory Cli…
140 files/d
Takt: 3.2 min
EDI / Continuous Portal
MRP / Real-Time Sanctions
★ PACEMAKER
IN
Insert a step at the start
+
I
168
1.20 d
Drag to reorder step 1
ONBOARDING
1. Drift Threshold …
×2
FIFO Lane
C/T
2.1 min
C/O
3 min
Availability
97%
Quality FPY
92.5%
Batch / EPEI
28 / 1d
OEE
86.7%
i
FIFO
Insert a step here
+
I
196
1.40 d
Drag to reorder step 2
FINCRIME SCREENING
2. Tax-Lot Capital …
×2
Push Flow
C/T
2.5 min
C/O
4 min
Availability
95%
Quality FPY
90.0%
Batch / EPEI
28 / 1d
OEE
81.7%
i
Insert a step here
+
I
392
2.80 d
AUTOMATION
False-Pos…
Drag to reorder step 3
COMPLIANCE OFFICER
3. Suitability Comp…
×3
BOTTLENECK
C/T
3.4 min
C/O
8 min
Availability
86%
Quality FPY
89.5%
Batch / EPEI
28 / 1d
OEE
70.1%
i
Insert a step here
+
I
112
0.80 d
Drag to reorder step 4
PRIVATE BANKER
4. FIX Bulk Block T…
×2
FIFO Lane
C/T
2.3 min
C/O
5 min
Availability
96%
Quality FPY
97.6%
Batch / EPEI
21 / 1d
OEE
86.8%
i
FIFO
Insert a step here
+
I
56
0.40 d
Drag to reorder step 5
OPERATIONS
5. Client PDF Perfo…
×1
Continuous Flow
C/T
93 s
C/O
2 min
Availability
99%
Quality FPY
99.4%
Batch / EPEI
14 / 1d
OEE
94.0%
i
Insert a step at the end
+
I
56
0.40 d
Finished Goods
OUT
1.20 d
VA 2.1 min
1.40 d
VA 2.5 min
2.80 d
VA 3.4 min
0.80 d
VA 2.3 min
0.40 d
VA 93 s
0.40 d
Total Lead Time
7.03 d
VA Time
11.7 min
PCE
0.37%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step