Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Workers Compensation Injury & Return-to-Work Case
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
5.3 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.24 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
19.4 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.52%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Nurse Case Manager Medical Hold
55 < 85/day
Limit: downtime
Nurse Case Manager Medical Hold: capacity 55/day vs demand 85/day. Main limit: downtime. Raw C/T 5.7 min, effective C/T 7.5 min.
Quality (RTY)
70.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€146,370
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
5.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Occupational Physicia…
Accident Report & Physi…
Daily Adjusters · LT 3d
PRODUCTION CONTROL / ERP
Claims Case ERP
Manual Triage & Pool Escalation
CUSTOMER
Injured Workers & Emp…
85 claims/d
Takt: 5.3 min
EDI / Daily Payout
MRP / Daily Adjusters
★ PACEMAKER
IN
Insert a step at the start
+
I
119
1.40 d
Drag to reorder step 1
CONTACT CENTER
1. First Report of …
×4
Push Flow
C/T
3.6 min
C/O
3 min
Availability
97%
Quality FPY
88.0%
Batch / EPEI
17 / 1d
OEE
82.5%
i
Insert a step here
+
I
153
1.80 d
Drag to reorder step 2
BACK OFFICE
2. Compensability F…
×3
Push Flow
C/T
4.1 min
C/O
5 min
Availability
94%
Quality FPY
93.5%
Batch / EPEI
21 / 1d
OEE
83.9%
i
Insert a step here
+
I
289
3.40 d
AUTOMATION
Fast-Trac…
Drag to reorder step 3
TECHNICAL CLAIMS
3. Nurse Case Manag…
×5
BOTTLENECK
C/T
5.7 min
C/O
10 min
Availability
86%
Quality FPY
89.0%
Batch / EPEI
21 / 2d
OEE
69.7%
i
Insert a step here
+
I
68
0.80 d
Drag to reorder step 4
CLAIMS LEAD
4. Bi-Weekly Wage B…
×2
FIFO Lane
C/T
3.6 min
C/O
4 min
Availability
96%
Quality FPY
97.4%
Batch / EPEI
9 / 1d
OEE
85.7%
i
FIFO
Insert a step here
+
I
34
0.40 d
Drag to reorder step 5
FINANCE OPS
5. Modified Duty Re…
×1
Continuous Flow
C/T
2.4 min
C/O
2 min
Availability
99%
Quality FPY
99.1%
Batch / EPEI
9 / 1d
OEE
94.0%
i
Insert a step at the end
+
I
34
0.40 d
Finished Goods
OUT
1.40 d
VA 3.6 min
1.80 d
VA 4.1 min
3.40 d
VA 5.7 min
0.80 d
VA 3.6 min
0.40 d
VA 2.4 min
0.40 d
Total Lead Time
8.24 d
VA Time
19.4 min
PCE
0.52%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step