Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Vacuum Sterilized Organic Baby Food Glass Jar
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.9 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.00 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
7.6 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.00%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Overpressure Water Autoclave
19,509 < 28,000/day
Limit: downtime
Overpressure Water Autoclave: capacity 19,509/day vs demand 28,000/day. Main limit: downtime. Raw C/T 2.1 s, effective C/T 2.6 s.
Quality (RTY)
91.1%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€174,720
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
4,472.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Organic Farm Orchards
Steam-Cooked Purees
2x / week · LT 4d
PRODUCTION CONTROL / ERP
ERP
Allergen Campaign Push
CUSTOMER
Pharmacy & Grocery Ba…
28,000 packs/d
Takt: 1.9 s
EDI / Daily Frozen/Dry
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
30,800
1.10 d
Drag to reorder step 1
KITCHEN PREP
1. Micro-Mill Vacuu…
×3
Push Flow
C/T
1.3 s
C/O
25 min
Availability
95%
Quality FPY
98.8%
Batch / EPEI
22400 / 1d
OEE
90.6%
i
Insert a step here
+
I
36,400
1.30 d
Drag to reorder step 2
THERMAL BLOCK
2. 180°C Hot Fill &…
×2
Push Flow
C/T
1.6 s
C/O
40 min
Availability
90%
Quality FPY
97.5%
Batch / EPEI
22400 / 2d
OEE
82.9%
i
Insert a step here
+
I
50,400
1.80 d
FLOW
Rotary Re…
Drag to reorder step 3
RETORT/PACK
3. Overpressure Wat…
×2
BOTTLENECK
C/T
2.1 s
C/O
55 min
Availability
84%
Quality FPY
96.2%
Batch / EPEI
28000 / 2d
OEE
75.9%
i
Insert a step here
+
I
22,400
0.80 d
Drag to reorder step 4
FOOD SAFETY
4. Dud Cap Vacuum C…
×1
FIFO Lane
C/T
1.4 s
C/O
8 min
Availability
96%
Quality FPY
98.9%
Batch / EPEI
8400 / 1d
OEE
92.1%
i
FIFO
Insert a step here
+
I
33,600
1.20 d
Drag to reorder step 5
FROZEN DOCK
5. 6-Jar Shrink Sle…
×2
FIFO Lane
C/T
1.2 s
C/O
10 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
8400 / 1d
OEE
92.8%
i
Insert a step at the end
+
I
50,400
1.80 d
Finished Goods
OUT
1.10 d
VA 1.3 s
1.30 d
VA 1.6 s
1.80 d
VA 2.1 s
0.80 d
VA 1.4 s
1.20 d
VA 1.2 s
1.80 d
Total Lead Time
8.00 d
VA Time
7.6 s
PCE
0.00%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step