Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
80/20 Frozen Beef Burger Patty IQF Tunnel
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.9 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
3.50 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
7.5 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.00%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Cryogenic -70°C Crust Freeze
19,434 < 28,000/day
Limit: downtime
Cryogenic -70°C Crust Freeze: capacity 19,434/day vs demand 28,000/day. Main limit: downtime. Raw C/T 2.1 s, effective C/T 2.6 s.
Quality (RTY)
90.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€176,400
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
3,118.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Chilled Beef Trim Blo…
Frozen/Fresh 80CL Beef …
Daily Live/Catch · LT 1d
PRODUCTION CONTROL / ERP
ERP
Day-Fresh FIFO Slaughter/Catch
CUSTOMER
QSR Fast-Food Chains
28,000 packs/d
Takt: 1.9 s
EDI / Same-Day Cold
MRP / Daily Live/Catch
★ PACEMAKER
IN
Insert a step at the start
+
I
16,800
0.60 d
Drag to reorder step 1
COLD CUT BAY
1. Grind, Temp-Blen…
×6
FIFO Lane
C/T
1.3 s
C/O
15 min
Availability
95%
Quality FPY
97.6%
Batch / EPEI
8400 / 1d
OEE
87.6%
i
FIFO
Insert a step here
+
I
19,600
0.70 d
Drag to reorder step 2
PREP COLD
2. High-Speed Hydra…
×3
Push Flow
C/T
1.6 s
C/O
20 min
Availability
92%
Quality FPY
98.2%
Batch / EPEI
11200 / 1d
OEE
85.3%
i
Insert a step here
+
I
25,200
0.90 d
QUALITY
Vacuum Ga…
Drag to reorder step 3
COLD PACK/IQF
3. Cryogenic -70°C …
×3
BOTTLENECK
C/T
2.1 s
C/O
30 min
Availability
84%
Quality FPY
96.4%
Batch / EPEI
14000 / 1d
OEE
75.6%
i
Insert a step here
+
I
11,200
0.40 d
Drag to reorder step 4
CHECKWEIGH
4. Spiral IQF Core …
×2
FIFO Lane
C/T
1.3 s
C/O
10 min
Availability
95%
Quality FPY
98.8%
Batch / EPEI
5600 / 1d
OEE
88.6%
i
FIFO
Insert a step here
+
I
11,200
0.40 d
Drag to reorder step 5
CHILLED DOCK
5. Paper Interleave…
×2
Continuous Flow
C/T
1.2 s
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
5600 / 1d
OEE
92.1%
i
Insert a step at the end
+
I
14,000
0.50 d
Finished Goods
OUT
0.60 d
VA 1.3 s
0.70 d
VA 1.6 s
0.90 d
VA 2.1 s
0.40 d
VA 1.3 s
0.40 d
VA 1.2 s
0.50 d
Total Lead Time
3.50 d
VA Time
7.5 s
PCE
0.00%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step