Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Continuous Churn Cultured Butter Parchment Wrap
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
3.0 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.20 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
12 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.00%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
80-bpm Foil Parchment Wrap
12,068 < 18,000/day
Limit: downtime
80-bpm Foil Parchment Wrap: capacity 12,068/day vs demand 18,000/day. Main limit: downtime. Raw C/T 3.2 s, effective C/T 4.1 s.
Quality (RTY)
92.5%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€226,800
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1,439.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
High-Fat Fresh Cream
40% Cream & Butter Cult…
Daily Tanker · LT 2d
PRODUCTION CONTROL / ERP
ERP
Shelf-Life Campaign MRP
CUSTOMER
Grocery Dairy Counters
18,000 packs/d
Takt: 3.0 s
EDI / Daily Reefer
MRP / Daily Tanker
★ PACEMAKER
IN
Insert a step at the start
+
I
21,600
1.20 d
Drag to reorder step 1
WET ZONE
1. Cream Aging & Co…
×1
Continuous Flow
C/T
2.0 s
C/O
25 min
Availability
95%
Quality FPY
99.1%
Batch / EPEI
18000 / 1d
OEE
91.5%
i
Insert a step here
+
I
19,800
1.10 d
Drag to reorder step 2
PROCESS ROOM
2. Vacuum Texturize…
×2
Push Flow
C/T
2.4 s
C/O
35 min
Availability
92%
Quality FPY
98.4%
Batch / EPEI
14400 / 1d
OEE
86.1%
i
Insert a step here
+
I
27,000
1.50 d
GREEN
Parallel …
Drag to reorder step 3
THERMAL BLOCK
3. 80-bpm Foil Parc…
×2
BOTTLENECK
C/T
3.2 s
C/O
85 min
Availability
81%
Quality FPY
97.5%
Batch / EPEI
18000 / 2d
OEE
71.5%
i
Insert a step here
+
I
16,200
0.90 d
Drag to reorder step 4
FILL ROOM
4. Inline Metal & W…
×2
FIFO Lane
C/T
2.5 s
C/O
30 min
Availability
90%
Quality FPY
97.9%
Batch / EPEI
9000 / 1d
OEE
82.2%
i
FIFO
Insert a step here
+
I
19,800
1.10 d
Drag to reorder step 5
COLD OUTBOUND
5. +4°C Case Box & …
×1
FIFO Lane
C/T
1.9 s
C/O
12 min
Availability
96%
Quality FPY
99.4%
Batch / EPEI
7200 / 1d
OEE
92.2%
i
Insert a step at the end
+
I
25,200
1.40 d
Finished Goods
OUT
1.20 d
VA 2.0 s
1.10 d
VA 2.4 s
1.50 d
VA 3.2 s
0.90 d
VA 2.5 s
1.10 d
VA 1.9 s
1.40 d
Total Lead Time
7.20 d
VA Time
12 s
PCE
0.00%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step