Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Twin-Screw Extruded Multigrain Cereal Line
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
2.6 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
5.90 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
10 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.00%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Toasting Impingement Oven
15,364 < 21,000/day
Limit: downtime
Toasting Impingement Oven: capacity 15,364/day vs demand 21,000/day. Main limit: downtime. Raw C/T 2.7 s, effective C/T 3.3 s.
Quality (RTY)
91.6%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€167,265
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
2,295.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Whole Corn, Rice & Ho…
Flaked Grits & Vitamin …
2x / week · LT 3d
PRODUCTION CONTROL / ERP
ERP
Thermal Oven Scheduling
CUSTOMER
National Supermarkets
21,000 packs/d
Takt: 2.6 s
EDI / Daily Fresh/Frozen
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
18,900
0.90 d
Drag to reorder step 1
DOUGH MIXING
1. Pressure Steam C…
×2
Push Flow
C/T
1.7 s
C/O
25 min
Availability
95%
Quality FPY
99.0%
Batch / EPEI
12600 / 1d
OEE
89.7%
i
Insert a step here
+
I
21,000
1.00 d
Drag to reorder step 2
PROOFER
2. Tempering Bin & …
×2
Push Flow
C/T
2.1 s
C/O
30 min
Availability
92%
Quality FPY
98.1%
Batch / EPEI
10500 / 1d
OEE
84.2%
i
Insert a step here
+
I
27,300
1.30 d
SMED
Single-La…
Drag to reorder step 3
BAKE ZONE
3. Toasting Impinge…
×2
BOTTLENECK
C/T
2.7 s
C/O
45 min
Availability
85%
Quality FPY
96.4%
Batch / EPEI
16800 / 2d
OEE
76.8%
i
Insert a step here
+
I
16,800
0.80 d
Drag to reorder step 4
COOLING
4. Honey Coat Drum …
×1
Continuous Flow
C/T
2.0 s
C/O
12 min
Availability
94%
Quality FPY
98.6%
Batch / EPEI
6300 / 1d
OEE
88.6%
i
Insert a step here
+
I
14,700
0.70 d
Drag to reorder step 5
PACK LINE
5. Vertical Bag & C…
×2
FIFO Lane
C/T
1.6 s
C/O
18 min
Availability
93%
Quality FPY
99.2%
Batch / EPEI
6300 / 1d
OEE
86.1%
i
Insert a step at the end
+
I
25,200
1.20 d
Finished Goods
OUT
0.90 d
VA 1.7 s
1.00 d
VA 2.1 s
1.30 d
VA 2.7 s
0.80 d
VA 2.0 s
0.70 d
VA 1.6 s
1.20 d
Total Lead Time
5.90 d
VA Time
10 s
PCE
0.00%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step