Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
2.3 s
Lead Time (LT)
9.20 d
Value-Added
8.6 s
Efficiency (PCE)
0.00%
BottleneckVibratory Fluid-Bed Drying
17,225 < 24,000/day
Limit: downtime
Quality (RTY)
92.3%
WIP Capital
€209,760
Carbon CO₂
2,242.9 t CO₂e/year