Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Fresh Triple-Wash Chilled Deli Pasta Salad
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
3.6 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
3.50 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
14 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.01%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Foil Heat-Seal Film Membrane
10,465 < 15,000/day
Limit: downtime
Foil Heat-Seal Film Membrane: capacity 10,465/day vs demand 15,000/day. Main limit: downtime. Raw C/T 3.9 s, effective C/T 4.8 s.
Quality (RTY)
90.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€73,500
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1,670.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Blanched Pasta & Fres…
Mayonnaise Dressing & H…
Daily Live/Catch · LT 1d
PRODUCTION CONTROL / ERP
ERP
Day-Fresh FIFO Slaughter/Catch
CUSTOMER
ConvenienceGrab & Go
15,000 packs/d
Takt: 3.6 s
EDI / Same-Day Cold
MRP / Daily Live/Catch
★ PACEMAKER
IN
Insert a step at the start
+
I
9,000
0.60 d
Drag to reorder step 1
COLD CUT BAY
1. Ozone Ice-Water …
×6
FIFO Lane
C/T
2.5 s
C/O
15 min
Availability
95%
Quality FPY
97.6%
Batch / EPEI
4500 / 1d
OEE
87.6%
i
FIFO
Insert a step here
+
I
10,500
0.70 d
Drag to reorder step 2
PREP COLD
2. Chilled Blend & …
×3
Push Flow
C/T
3.0 s
C/O
20 min
Availability
92%
Quality FPY
98.2%
Batch / EPEI
6000 / 1d
OEE
85.3%
i
Insert a step here
+
I
13,500
0.90 d
QUALITY
Vacuum Ga…
Drag to reorder step 3
COLD PACK/IQF
3. Foil Heat-Seal F…
×3
BOTTLENECK
C/T
3.9 s
C/O
30 min
Availability
84%
Quality FPY
96.4%
Batch / EPEI
7500 / 1d
OEE
75.6%
i
Insert a step here
+
I
6,000
0.40 d
Drag to reorder step 4
CHECKWEIGH
4. Snap Clear Lid &…
×2
FIFO Lane
C/T
2.5 s
C/O
10 min
Availability
95%
Quality FPY
98.8%
Batch / EPEI
3000 / 1d
OEE
88.6%
i
FIFO
Insert a step here
+
I
6,000
0.40 d
Drag to reorder step 5
CHILLED DOCK
5. +2°C Crate & Sam…
×2
Continuous Flow
C/T
2.0 s
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
3000 / 1d
OEE
92.1%
i
Insert a step at the end
+
I
7,500
0.50 d
Finished Goods
OUT
0.60 d
VA 2.5 s
0.70 d
VA 3.0 s
0.90 d
VA 3.9 s
0.40 d
VA 2.5 s
0.40 d
VA 2.0 s
0.50 d
Total Lead Time
3.50 d
VA Time
14 s
PCE
0.01%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step