Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
3.0 s
Lead Time (LT)
8.20 d
Value-Added
12 s
Efficiency (PCE)
0.00%
Bottleneck24-Head Rotary Micro-Filler
13,312 < 18,000/day
Limit: downtime
Quality (RTY)
92.0%
WIP Capital
€605,160
Carbon CO₂
1,805.8 t CO₂e/year