Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
20-Ton/Hr Water-Gun Cut Par-Fried French Fries
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
4.5 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.00 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
18 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.00%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Optical Defect Laser & Blanch
12,814 < 18,000/day
Limit: downtime
Optical Defect Laser & Blanch: capacity 12,814/day vs demand 18,000/day. Main limit: downtime. Raw C/T 4.9 s, effective C/T 6.1 s.
Quality (RTY)
91.1%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€237,600
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
2,875.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Russet Storage Sheds
Washed Whole Russet Pot…
2x / week · LT 4d
PRODUCTION CONTROL / ERP
ERP
Allergen Campaign Push
CUSTOMER
Global QSR Chains
18,000 packs/d
Takt: 4.5 s
EDI / Daily Frozen/Dry
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
19,800
1.10 d
Drag to reorder step 1
KITCHEN PREP
1. Steam Peel & Bru…
×3
Push Flow
C/T
3.1 s
C/O
25 min
Availability
95%
Quality FPY
98.8%
Batch / EPEI
14400 / 1d
OEE
91.7%
i
Insert a step here
+
I
23,400
1.30 d
Drag to reorder step 2
THERMAL BLOCK
2. Hydro-Jet Blade …
×2
Push Flow
C/T
3.8 s
C/O
40 min
Availability
90%
Quality FPY
97.5%
Batch / EPEI
14400 / 2d
OEE
84.5%
i
Insert a step here
+
I
32,400
1.80 d
FLOW
Rotary Re…
Drag to reorder step 3
RETORT/PACK
3. Optical Defect L…
×2
BOTTLENECK
C/T
4.9 s
C/O
55 min
Availability
84%
Quality FPY
96.2%
Batch / EPEI
18000 / 2d
OEE
77.5%
i
Insert a step here
+
I
14,400
0.80 d
Drag to reorder step 4
FOOD SAFETY
4. Flash Par-Fry & …
×1
FIFO Lane
C/T
3.2 s
C/O
8 min
Availability
96%
Quality FPY
98.9%
Batch / EPEI
5400 / 1d
OEE
93.1%
i
FIFO
Insert a step here
+
I
21,600
1.20 d
Drag to reorder step 5
FROZEN DOCK
5. Auto Weigh 2.5kg…
×2
FIFO Lane
C/T
2.6 s
C/O
10 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
5400 / 1d
OEE
94.0%
i
Insert a step at the end
+
I
32,400
1.80 d
Finished Goods
OUT
1.10 d
VA 3.1 s
1.30 d
VA 3.8 s
1.80 d
VA 4.9 s
0.80 d
VA 3.2 s
1.20 d
VA 2.6 s
1.80 d
Total Lead Time
8.00 d
VA Time
18 s
PCE
0.00%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step