Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
GMP Stage-1 Spray-Dried Infant Formula Can Line
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
5.8 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.20 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
23 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.00%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Double-Seam Vacuum Gas Can
9,668 < 14,000/day
Limit: downtime
Double-Seam Vacuum Gas Can: capacity 9,668/day vs demand 14,000/day. Main limit: downtime. Raw C/T 6.2 s, effective C/T 7.9 s.
Quality (RTY)
92.5%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€786,240
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1,119.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Lactose, WPC & DHA Oi…
Spray-Dry Base Powder &…
Daily Tanker · LT 2d
PRODUCTION CONTROL / ERP
ERP
Shelf-Life Campaign MRP
CUSTOMER
Pharmacies & Export M…
14,000 packs/d
Takt: 5.8 s
EDI / Daily Reefer
MRP / Daily Tanker
★ PACEMAKER
IN
Insert a step at the start
+
I
16,800
1.20 d
Drag to reorder step 1
WET ZONE
1. Dry Blend Micro-…
×1
Continuous Flow
C/T
3.8 s
C/O
25 min
Availability
95%
Quality FPY
99.1%
Batch / EPEI
14000 / 1d
OEE
92.4%
i
Insert a step here
+
I
15,400
1.10 d
Drag to reorder step 2
PROCESS ROOM
2. High-Tower Spray…
×2
Push Flow
C/T
4.6 s
C/O
35 min
Availability
92%
Quality FPY
98.4%
Batch / EPEI
11200 / 1d
OEE
87.6%
i
Insert a step here
+
I
21,000
1.50 d
GREEN
Parallel …
Drag to reorder step 3
THERMAL BLOCK
3. Double-Seam Vacu…
×2
BOTTLENECK
C/T
6.2 s
C/O
85 min
Availability
81%
Quality FPY
97.5%
Batch / EPEI
14000 / 2d
OEE
74.0%
i
Insert a step here
+
I
12,600
0.90 d
Drag to reorder step 4
FILL ROOM
4. Scoop Drop & Tam…
×2
FIFO Lane
C/T
4.9 s
C/O
30 min
Availability
90%
Quality FPY
97.9%
Batch / EPEI
7000 / 1d
OEE
84.2%
i
FIFO
Insert a step here
+
I
15,400
1.10 d
Drag to reorder step 5
COLD OUTBOUND
5. Hold Release Cro…
×1
FIFO Lane
C/T
3.6 s
C/O
12 min
Availability
96%
Quality FPY
99.4%
Batch / EPEI
5600 / 1d
OEE
93.3%
i
Insert a step at the end
+
I
19,600
1.40 d
Finished Goods
OUT
1.20 d
VA 3.8 s
1.10 d
VA 4.6 s
1.50 d
VA 6.2 s
0.90 d
VA 4.9 s
1.10 d
VA 3.6 s
1.40 d
Total Lead Time
7.20 d
VA Time
23 s
PCE
0.00%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step