Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
8.3 s
Lead Time (LT)
7.20 d
Value-Added
33 s
Efficiency (PCE)
0.01%
BottleneckChilled Salt-Brine Tunnel
4,339 < 6,500/day
Limit: downtime
Quality (RTY)
92.5%
WIP Capital
€131,040
Carbon CO₂
519.9 t CO₂e/year