Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
30,000 bph Returnable Glass Soda Line
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
9.9 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.20 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
39 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.01%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Empty Bottle Optical EBI
6,138 < 8,200/day
Limit: downtime
Empty Bottle Optical EBI: capacity 6,138/day vs demand 8,200/day. Main limit: downtime. Raw C/T 10 s, effective C/T 13 s.
Quality (RTY)
92.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€194,996
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
822.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Glass Loop Crates
Returned Dirty Glass Cr…
2x / week · LT 4d
PRODUCTION CONTROL / ERP
ERP
Weekly Format Campaign Push
CUSTOMER
HORECA & Retail Netwo…
8,200 crates/d
Takt: 9.9 s
EDI / Daily FTL
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
14,760
1.80 d
Drag to reorder step 1
DRY END
1. Crate Unpack & C…
×1
Continuous Flow
C/T
6.7 s
C/O
45 min
Availability
92%
Quality FPY
98.8%
Batch / EPEI
9840 / 2d
OEE
88.4%
i
Insert a step here
+
I
12,300
1.50 d
SMED
SMED + TP…
Drag to reorder step 2
ASEPTIC BLOCK
2. Empty Bottle Opt…
×2
BOTTLENECK
C/T
10 s
C/O
65 min
Availability
84%
Quality FPY
96.8%
Batch / EPEI
9840 / 3d
OEE
78.0%
i
Insert a step here
+
I
11,480
1.40 d
Drag to reorder step 3
SLEEVING
3. Isobaric Fill & …
×1
Push Flow
C/T
7.5 s
C/O
25 min
Availability
92%
Quality FPY
98.2%
Batch / EPEI
4920 / 1d
OEE
87.6%
i
Insert a step here
+
I
9,840
1.20 d
GREEN
Eco Shrin…
Drag to reorder step 4
END OF LINE
4. Wet-Glue Paper L…
×1
Push Flow
C/T
7.9 s
C/O
30 min
Availability
91%
Quality FPY
98.5%
Batch / EPEI
4100 / 1d
OEE
85.7%
i
Insert a step here
+
I
6,560
0.80 d
Drag to reorder step 5
LINE LOGISTICS
5. Auto Re-Crate & …
×1
FIFO Lane
C/T
6.3 s
C/O
10 min
Availability
96%
Quality FPY
99.5%
Batch / EPEI
2460 / 1d
OEE
93.2%
i
Insert a step at the end
+
I
12,300
1.50 d
Finished Goods
OUT
1.80 d
VA 6.7 s
1.50 d
VA 10 s
1.40 d
VA 7.5 s
1.20 d
VA 7.9 s
0.80 d
VA 6.3 s
1.50 d
Total Lead Time
8.20 d
VA Time
39 s
PCE
0.01%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step