Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Fluid-Bed Coffee Roasting & N2 Valve Bag Line
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
4.9 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.20 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
19 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.00%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
24h CO2 Degassing Silos
7,800 < 11,000/day
Limit: downtime
24h CO2 Degassing Silos: capacity 7,800/day vs demand 11,000/day. Main limit: downtime. Raw C/T 5.3 s, effective C/T 6.5 s.
Quality (RTY)
92.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€627,440
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1,028.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Green Arabica Bean Si…
Washed Ethiopia/Colombia
Weekly Grain/Oil · LT 7d
PRODUCTION CONTROL / ERP
ERP
Bulk Silo Campaign Push
CUSTOMER
Retail & Cafe Wholesa…
11,000 packs/d
Takt: 4.9 s
EDI / Daily Container/Van
MRP / Weekly Grain/Oil
★ PACEMAKER
IN
Insert a step at the start
+
I
19,800
1.80 d
Drag to reorder step 1
INTAKE TOWER
1. Silo Blend & Air…
×1
Continuous Flow
C/T
3.1 s
C/O
25 min
Availability
95%
Quality FPY
99.1%
Batch / EPEI
16500 / 2d
OEE
92.4%
i
Insert a step here
+
I
17,600
1.60 d
Drag to reorder step 2
CORE PROCESS
2. Water-Quench & O…
×2
Push Flow
C/T
4.1 s
C/O
45 min
Availability
91%
Quality FPY
98.2%
Batch / EPEI
13200 / 2d
OEE
85.6%
i
Insert a step here
+
I
18,700
1.70 d
SMED
Allergen …
Drag to reorder step 3
PACK DECK
3. 24h CO2 Degassin…
×2
BOTTLENECK
C/T
5.3 s
C/O
50 min
Availability
84%
Quality FPY
96.5%
Batch / EPEI
11000 / 2d
OEE
76.6%
i
Insert a step here
+
I
12,100
1.10 d
Drag to reorder step 4
FOOD LAB
4. 1-Way Valve Foil…
×2
FIFO Lane
C/T
3.5 s
C/O
10 min
Availability
95%
Quality FPY
98.8%
Batch / EPEI
5500 / 1d
OEE
91.8%
i
FIFO
Insert a step here
+
I
11,000
1.00 d
Drag to reorder step 5
WAREHOUSE
5. Checkweigh & Dis…
×1
FIFO Lane
C/T
2.7 s
C/O
10 min
Availability
97%
Quality FPY
99.5%
Batch / EPEI
4400 / 1d
OEE
93.8%
i
Insert a step at the end
+
I
22,000
2.00 d
Finished Goods
OUT
1.80 d
VA 3.1 s
1.60 d
VA 4.1 s
1.70 d
VA 5.3 s
1.10 d
VA 3.5 s
1.00 d
VA 2.7 s
2.00 d
Total Lead Time
9.20 d
VA Time
19 s
PCE
0.00%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step