Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Norwegian Salmon Fillet Vacuum Skin Pack (VSP)
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
4.9 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
3.50 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
19 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.01%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
VSP Thermoform Barrier Film
7,700 < 11,000/day
Limit: downtime
VSP Thermoform Barrier Film: capacity 7,700/day vs demand 11,000/day. Main limit: downtime. Raw C/T 5.3 s, effective C/T 6.5 s.
Quality (RTY)
90.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€188,650
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1,225.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Aquaculture Harvest P…
Gutted Head-On Fresh Sa…
Daily Live/Catch · LT 1d
PRODUCTION CONTROL / ERP
ERP
Day-Fresh FIFO Slaughter/Catch
CUSTOMER
European Seafood Reta…
11,000 packs/d
Takt: 4.9 s
EDI / Same-Day Cold
MRP / Daily Live/Catch
★ PACEMAKER
IN
Insert a step at the start
+
I
6,600
0.60 d
Drag to reorder step 1
COLD CUT BAY
1. Automatic Pin-Bo…
×6
FIFO Lane
C/T
3.4 s
C/O
15 min
Availability
95%
Quality FPY
97.6%
Batch / EPEI
3300 / 1d
OEE
87.6%
i
FIFO
Insert a step here
+
I
7,700
0.70 d
Drag to reorder step 2
PREP COLD
2. 250g Fixed-Weigh…
×3
Push Flow
C/T
4.0 s
C/O
20 min
Availability
92%
Quality FPY
98.2%
Batch / EPEI
4400 / 1d
OEE
85.3%
i
Insert a step here
+
I
9,900
0.90 d
QUALITY
Vacuum Ga…
Drag to reorder step 3
COLD PACK/IQF
3. VSP Thermoform B…
×3
BOTTLENECK
C/T
5.3 s
C/O
30 min
Availability
84%
Quality FPY
96.4%
Batch / EPEI
5500 / 1d
OEE
75.6%
i
Insert a step here
+
I
4,400
0.40 d
Drag to reorder step 4
CHECKWEIGH
4. Salt-Smoke / Chi…
×2
FIFO Lane
C/T
3.4 s
C/O
10 min
Availability
95%
Quality FPY
98.8%
Batch / EPEI
2200 / 1d
OEE
88.6%
i
FIFO
Insert a step here
+
I
4,400
0.40 d
Drag to reorder step 5
CHILLED DOCK
5. Metal Check & Th…
×2
Continuous Flow
C/T
2.7 s
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
2200 / 1d
OEE
92.1%
i
Insert a step at the end
+
I
5,500
0.50 d
Finished Goods
OUT
0.60 d
VA 3.4 s
0.70 d
VA 4.0 s
0.90 d
VA 5.3 s
0.40 d
VA 3.4 s
0.40 d
VA 2.7 s
0.50 d
Total Lead Time
3.50 d
VA Time
19 s
PCE
0.01%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step