Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Continuous Beechwood Smoke Frankfurter Line
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
2.4 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
3.50 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
9.2 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.00%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Continuous Smoke-Steam-Chill
25,070 < 34,000/day
Limit: downtime
Continuous Smoke-Steam-Chill: capacity 25,070/day vs demand 34,000/day. Main limit: downtime. Raw C/T 2.5 s, effective C/T 3.1 s.
Quality (RTY)
90.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€142,800
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
3,787.1 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Lean Pork/Poultry & S…
Fine Emulsion & Cellulo…
Daily Live/Catch · LT 1d
PRODUCTION CONTROL / ERP
MES
Day-Fresh FIFO Slaughter/Catch
CUSTOMER
Grocery & Stadiums
34,000 packs/d
Takt: 2.4 s
EDI / Same-Day Cold
MRP / Daily Live/Catch
★ PACEMAKER
IN
Insert a step at the start
+
I
20,400
0.60 d
Drag to reorder step 1
COLD CUT BAY
1. Bowl Chopper Emu…
×6
FIFO Lane
C/T
1.7 s
C/O
15 min
Availability
95%
Quality FPY
97.6%
Batch / EPEI
10200 / 1d
OEE
89.3%
i
FIFO
Insert a step here
+
I
23,800
0.70 d
Drag to reorder step 2
PREP COLD
2. High-Speed Stuff…
×3
Push Flow
C/T
2.0 s
C/O
20 min
Availability
92%
Quality FPY
98.2%
Batch / EPEI
13600 / 1d
OEE
87.0%
i
Insert a step here
+
I
30,600
0.90 d
QUALITY
Vacuum Ga…
Drag to reorder step 3
COLD PACK/IQF
3. Continuous Smoke…
×3
BOTTLENECK
C/T
2.5 s
C/O
30 min
Availability
84%
Quality FPY
96.4%
Batch / EPEI
17000 / 1d
OEE
77.4%
i
Insert a step here
+
I
13,600
0.40 d
Drag to reorder step 4
CHECKWEIGH
4. High-Speed Steam…
×2
FIFO Lane
C/T
1.7 s
C/O
10 min
Availability
95%
Quality FPY
98.8%
Batch / EPEI
6800 / 1d
OEE
90.4%
i
FIFO
Insert a step here
+
I
13,600
0.40 d
Drag to reorder step 5
CHILLED DOCK
5. Vacuum 8-Pack & …
×2
Continuous Flow
C/T
1.3 s
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
6800 / 1d
OEE
93.6%
i
Insert a step at the end
+
I
17,000
0.50 d
Finished Goods
OUT
0.60 d
VA 1.7 s
0.70 d
VA 2.0 s
0.90 d
VA 2.5 s
0.40 d
VA 1.7 s
0.40 d
VA 1.3 s
0.50 d
Total Lead Time
3.50 d
VA Time
9.2 s
PCE
0.00%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step