Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Hot-Fill / Aseptic Sport Isotonic Cap Line
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
6.5 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.20 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
25 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.00%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Ultra-Clean Sports Cap Torque
9,436 < 12,500/day
Limit: downtime
Ultra-Clean Sports Cap Torque: capacity 9,436/day vs demand 12,500/day. Main limit: downtime. Raw C/T 6.7 s, effective C/T 8.2 s.
Quality (RTY)
92.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€317,750
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1,254.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Sport Cap Supplier
Crystallized Neck PET
2x / week · LT 4d
PRODUCTION CONTROL / ERP
ERP
Weekly Format Campaign Push
CUSTOMER
Convenience & Gym Cha…
12,500 packs/d
Takt: 6.5 s
EDI / Daily FTL
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
22,500
1.80 d
Drag to reorder step 1
DRY END
1. Heat-Set Combi B…
×1
Continuous Flow
C/T
4.4 s
C/O
45 min
Availability
92%
Quality FPY
98.8%
Batch / EPEI
15000 / 2d
OEE
88.4%
i
Insert a step here
+
I
18,750
1.50 d
SMED
SMED + TP…
Drag to reorder step 2
ASEPTIC BLOCK
2. Ultra-Clean Spor…
×2
BOTTLENECK
C/T
6.7 s
C/O
65 min
Availability
84%
Quality FPY
96.8%
Batch / EPEI
15000 / 3d
OEE
78.0%
i
Insert a step here
+
I
17,500
1.40 d
Drag to reorder step 3
SLEEVING
3. Stepped Water Co…
×1
Push Flow
C/T
4.9 s
C/O
25 min
Availability
92%
Quality FPY
98.2%
Batch / EPEI
7500 / 1d
OEE
87.6%
i
Insert a step here
+
I
15,000
1.20 d
GREEN
Eco Shrin…
Drag to reorder step 4
END OF LINE
4. Steam Full-Body …
×1
Push Flow
C/T
5.2 s
C/O
30 min
Availability
91%
Quality FPY
98.5%
Batch / EPEI
6250 / 1d
OEE
85.7%
i
Insert a step here
+
I
10,000
0.80 d
Drag to reorder step 5
LINE LOGISTICS
5. Tray Film & High…
×1
FIFO Lane
C/T
4.1 s
C/O
10 min
Availability
96%
Quality FPY
99.5%
Batch / EPEI
3750 / 1d
OEE
93.2%
i
Insert a step at the end
+
I
18,750
1.50 d
Finished Goods
OUT
1.80 d
VA 4.4 s
1.50 d
VA 6.7 s
1.40 d
VA 4.9 s
1.20 d
VA 5.2 s
0.80 d
VA 4.1 s
1.50 d
Total Lead Time
8.20 d
VA Time
25 s
PCE
0.00%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step