Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
1.7 s
Lead Time (LT)
9.20 d
Value-Added
6.8 s
Efficiency (PCE)
0.00%
BottleneckFluid-Bed Dryer & Sieve Grade
35,126 < 48,000/day
Limit: downtime
Quality (RTY)
92.3%
WIP Capital
€287,040
Carbon CO₂
4,485.9 t CO₂e/year