Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Physically Refined Sunflower 5L PET Bottle Line
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
2.9 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.20 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
11 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.00%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Combi PET Blow-Fill Weight
20,396 < 28,000/day
Limit: downtime
Combi PET Blow-Fill Weight: capacity 20,396/day vs demand 28,000/day. Main limit: downtime. Raw C/T 3.1 s, effective C/T 3.8 s.
Quality (RTY)
92.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€476,560
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
2,616.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Crude Seed Crushers
Degummed Crude Sunflowe…
Weekly Grain/Oil · LT 7d
PRODUCTION CONTROL / ERP
ERP
Bulk Silo Campaign Push
CUSTOMER
Wholesale & Retail Ch…
28,000 packs/d
Takt: 2.9 s
EDI / Daily Container/Van
MRP / Weekly Grain/Oil
★ PACEMAKER
IN
Insert a step at the start
+
I
50,400
1.80 d
Drag to reorder step 1
INTAKE TOWER
1. Bleaching Earth …
×1
Continuous Flow
C/T
1.9 s
C/O
25 min
Availability
95%
Quality FPY
99.1%
Batch / EPEI
42000 / 2d
OEE
93.0%
i
Insert a step here
+
I
44,800
1.60 d
Drag to reorder step 2
CORE PROCESS
2. Steam Vacuum Deo…
×2
Push Flow
C/T
2.4 s
C/O
45 min
Availability
91%
Quality FPY
98.2%
Batch / EPEI
33600 / 2d
OEE
86.9%
i
Insert a step here
+
I
47,600
1.70 d
SMED
Allergen …
Drag to reorder step 3
PACK DECK
3. Combi PET Blow-F…
×2
BOTTLENECK
C/T
3.1 s
C/O
50 min
Availability
84%
Quality FPY
96.5%
Batch / EPEI
28000 / 2d
OEE
78.1%
i
Insert a step here
+
I
30,800
1.10 d
Drag to reorder step 4
FOOD LAB
4. Press-On Drip-Fr…
×2
FIFO Lane
C/T
2.1 s
C/O
10 min
Availability
95%
Quality FPY
98.8%
Batch / EPEI
14000 / 1d
OEE
92.5%
i
FIFO
Insert a step here
+
I
28,000
1.00 d
Drag to reorder step 5
WAREHOUSE
5. Wrap-Around Case…
×1
FIFO Lane
C/T
1.6 s
C/O
10 min
Availability
97%
Quality FPY
99.5%
Batch / EPEI
11200 / 1d
OEE
94.7%
i
Insert a step at the end
+
I
56,000
2.00 d
Finished Goods
OUT
1.80 d
VA 1.9 s
1.60 d
VA 2.4 s
1.70 d
VA 3.1 s
1.10 d
VA 2.1 s
1.00 d
VA 1.6 s
2.00 d
Total Lead Time
9.20 d
VA Time
11 s
PCE
0.00%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step