Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
95 s
Lead Time (LT)
9.20 d
Value-Added
6.1 min
Efficiency (PCE)
0.05%
Bottleneck4-Effect Vacuum Evaporator
620 < 850/day
Limit: downtime
Quality (RTY)
92.3%
WIP Capital
€1,524,900
Carbon CO₂
79.4 t CO₂e/year