Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
1.7 s
Lead Time (LT)
3.50 d
Value-Added
6.8 s
Efficiency (PCE)
0.00%
BottleneckHigh-Speed Chunk Pack & Oil
34,820 < 48,000/day
Limit: downtime
Quality (RTY)
90.7%
WIP Capital
€403,200
Carbon CO₂
5,346.4 t CO₂e/year