Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
4.2 s
Lead Time (LT)
7.20 d
Value-Added
17 s
Efficiency (PCE)
0.00%
BottleneckHigh-Speed Orbital Log Slicer
8,777 < 13,000/day
Limit: downtime
Quality (RTY)
92.5%
WIP Capital
€173,160
Carbon CO₂
1,039.9 t CO₂e/year