Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
450MW Gas Turbine Hot-Gas-Path Inspection
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
7.5 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.39 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
28.4 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
20.13%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Combustor Transition Swap
1 < 2/day
Limit: downtime
Combustor Transition Swap: capacity 1/day vs demand 2/day. Main limit: downtime. Raw C/T 8.1 h, effective C/T 10.1 h.
Quality (RTY)
85.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€975,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
OEM Coated Turbine Bl…
TBC Nozzles & Combustor…
Weekly Depot Pull · LT 6d
PRODUCTION CONTROL / ERP
PowerMRO ERP
Network Outage Window Queue
CUSTOMER
Utility Combined-Cycl…
2 cases/d
Takt: 7.5 h
EDI / Energized Bay
MRP / Weekly Depot Pull
★ PACEMAKER
IN
Insert a step at the start
+
I
4
2.00 d
Drag to reorder step 1
GRID DISPATCH
1. Barring Gear Coo…
×2
Push Flow
C/T
5.0 h
C/O
15 min
Availability
96%
Quality FPY
95.8%
Batch / EPEI
1 / 1d
OEE
90.4%
i
Insert a step here
+
I
3
1.50 d
Drag to reorder step 2
CIVIL FIELD
2. Row 1–3 Bucket P…
×4
Push Flow
C/T
5.9 h
C/O
20 min
Availability
93%
Quality FPY
97.6%
Batch / EPEI
1 / 1d
OEE
88.8%
i
Insert a step here
+
I
4
2.00 d
SMED
Mobile Su…
Drag to reorder step 3
HV CREW
3. Combustor Transi…
×5
BOTTLENECK
C/T
8.1 h
C/O
30 min
Availability
85%
Quality FPY
94.5%
Batch / EPEI
1 / 1d
OEE
77.6%
i
Insert a step here
+
I
2
1.00 d
Drag to reorder step 4
PROTECTION LAB
4. Top-Case Laser C…
×2
FIFO Lane
C/T
5.7 h
C/O
12 min
Availability
94%
Quality FPY
97.8%
Batch / EPEI
1 / 1d
OEE
90.7%
i
FIFO
Insert a step here
+
I
1
0.50 d
Drag to reorder step 5
CONTROL CENTER
5. Overspeed Trip &…
×1
Continuous Flow
C/T
3.8 h
C/O
5 min
Availability
98%
Quality FPY
99.4%
Batch / EPEI
1 / 1d
OEE
96.9%
i
Insert a step at the end
+
I
1
0.50 d
Finished Goods
OUT
2.00 d
VA 5.0 h
1.50 d
VA 5.9 h
2.00 d
VA 8.1 h
1.00 d
VA 5.7 h
0.50 d
VA 3.8 h
0.50 d
Total Lead Time
9.39 d
VA Time
28.4 h
PCE
20.13%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step