Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
1.3 h
Lead Time (LT)
7.96 d
Value-Added
4.7 h
Efficiency (PCE)
7.91%
BottleneckEdge Grid-Forming Droop Tune
4 < 6/day
Limit: changeovers
Quality (RTY)
85.9%
WIP Capital
€726,000
Carbon CO₂
4.9 t CO₂e/year