Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Industrial Islandable Solar+Genset Microgrid
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.3 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.96 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
4.7 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
7.91%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Edge Grid-Forming Droop Tune
4 < 6/day
Limit: changeovers
Edge Grid-Forming Droop Tune: capacity 4/day vs demand 6/day. Main limit: changeovers. Raw C/T 1.4 h, effective C/T 1.7 h.
Quality (RTY)
85.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€726,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
4.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Microgrid PLC & Relays
PV, BESS & Sync Paralle…
Weekly Depot Pull · LT 6d
PRODUCTION CONTROL / ERP
Microgrid SCADA
Network Outage Window Queue
CUSTOMER
Remote Mine & Campus …
6 cases/d
Takt: 1.3 h
EDI / Energized Bay
MRP / Weekly Depot Pull
★ PACEMAKER
IN
Insert a step at the start
+
I
11
1.83 d
Drag to reorder step 1
GRID DISPATCH
1. PCC Static Trans…
×2
Push Flow
C/T
49.5 min
C/O
15 min
Availability
96%
Quality FPY
95.8%
Batch / EPEI
2 / 1d
OEE
82.8%
i
Insert a step here
+
I
10
1.67 d
Drag to reorder step 2
CIVIL FIELD
2. Diesel Genset Go…
×4
Push Flow
C/T
58.5 min
C/O
20 min
Availability
93%
Quality FPY
97.6%
Batch / EPEI
2 / 1d
OEE
78.7%
i
Insert a step here
+
I
13
2.17 d
SMED
Mobile Su…
Drag to reorder step 3
HV CREW
3. Edge Grid-Formin…
×5
BOTTLENECK
C/T
1.4 h
C/O
30 min
Availability
85%
Quality FPY
94.5%
Batch / EPEI
2 / 1d
OEE
64.3%
i
Insert a step here
+
I
5
0.83 d
Drag to reorder step 4
PROTECTION LAB
4. Unplanned Island…
×2
FIFO Lane
C/T
57.0 min
C/O
12 min
Availability
94%
Quality FPY
97.8%
Batch / EPEI
1 / 1d
OEE
89.5%
i
FIFO
Insert a step here
+
I
2
0.33 d
Drag to reorder step 5
CONTROL CENTER
5. Seamless Re-Sync…
×1
Continuous Flow
C/T
37.5 min
C/O
5 min
Availability
98%
Quality FPY
99.4%
Batch / EPEI
1 / 1d
OEE
96.3%
i
Insert a step at the end
+
I
3
0.50 d
Finished Goods
OUT
1.83 d
VA 49.5 min
1.67 d
VA 58.5 min
2.17 d
VA 1.4 h
0.83 d
VA 57.0 min
0.33 d
VA 37.5 min
0.50 d
Total Lead Time
7.96 d
VA Time
4.7 h
PCE
7.91%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step