Storm Distribution Feeder Fault Isolation & Restore
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
30.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.51 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.9 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.12%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Crew Patrol & Tree Clear Cut
31 < 45/day
Limit: downtime
Crew Patrol & Tree Clear Cut: capacity 31/day vs demand 45/day. Main limit: downtime. Raw C/T 32.4 min, effective C/T 40.3 min.
Quality (RTY)
85.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€140,280
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
36.5 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
ADMS Fault Locator Al…
Pole Switches & Bucket …
Weekly Depot Pull · LT 6d
PRODUCTION CONTROL / ERP
ADMS Outage Ops
Network Outage Window Queue
CUSTOMER
Affected Grid Househo…
45 cases/d
Takt: 30.0 min
EDI / Energized Bay
MRP / Weekly Depot Pull
★ PACEMAKER
IN
Insert a step at the start
+
I
81
1.80 d
Drag to reorder step 1
GRID DISPATCH
1. ADMS Smart-Meter…
×2
Push Flow
C/T
19.8 min
C/O
15 min
Availability
96%
Quality FPY
95.8%
Batch / EPEI
14 / 1d
OEE
88.7%
i
Insert a step here
+
I
72
1.60 d
Drag to reorder step 2
CIVIL FIELD
2. FLISR Remote Sec…
×4
Push Flow
C/T
23.4 min
C/O
20 min
Availability
93%
Quality FPY
97.6%
Batch / EPEI
18 / 1d
OEE
87.4%
i
Insert a step here
+
I
99
2.20 d
SMED
Mobile Su…
Drag to reorder step 3
HV CREW
3. Crew Patrol & Tr…
×5
BOTTLENECK
C/T
32.4 min
C/O
30 min
Availability
85%
Quality FPY
94.5%
Batch / EPEI
14 / 1d
OEE
74.6%
i
Insert a step here
+
I
41
0.91 d
Drag to reorder step 4
PROTECTION LAB
4. Live-Line Hotsti…
×2
FIFO Lane
C/T
22.8 min
C/O
12 min
Availability
94%
Quality FPY
97.8%
Batch / EPEI
9 / 1d
OEE
87.8%
i
FIFO
Insert a step here
+
I
18
0.40 d
Drag to reorder step 5
CONTROL CENTER
5. Backfeed Confirm…
×1
Continuous Flow
C/T
15.0 min
C/O
5 min
Availability
98%
Quality FPY
99.4%
Batch / EPEI
5 / 1d
OEE
94.2%
i
Insert a step at the end
+
I
23
0.51 d
Finished Goods
OUT
1.80 d
VA 19.8 min
1.60 d
VA 23.4 min
2.20 d
VA 32.4 min
0.91 d
VA 22.8 min
0.40 d
VA 15.0 min
0.51 d
Total Lead Time
7.51 d
VA Time
1.9 h
PCE
1.12%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step