Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
84 s
Lead Time (LT)
7.41 d
Value-Added
5.3 min
Efficiency (PCE)
0.16%
BottleneckD4i LED Head & Tilt Bolt
185 < 320/day
Limit: changeovers
Quality (RTY)
85.9%
WIP Capital
€343,360
Carbon CO₂
259.4 t CO₂e/year